- Previous Article
- JIMO Home
- This Issue
-
Next Article
Gauss-Newton-on-manifold for pose estimation
October
2005, 1(4): 588-588.
doi: 10.3934/jimo.2005.1.588
Corrigendum
1. | Center for Intelligent Supply Networks, School of Management, P.O.Box 830688, SM 30, University of Texas at Dallas, Richardson, TX 75083-0688, United States |
2. | Dept. of Systems Engineering and Engineering Management, The Chinese University of Hong Kong, Shatin, N.T. Hong Kong |
3. | Department of Mathematics, City University of Hong Kong, Tat Chee Avenue, Kowloon, Hong Kong, China |
In Volume 1, 2005, issue number 3 on pages 275-287 of Journal of Industrial and
Management Optimization (JIMO), we published an article by J. Wu et al. entitled
''Supply contract model with service level constraint.''The article went through our
usual rigorous refereeing process and it was recommended by referees and the guest
editors for publication. Recently, Dr. Wu has written to Professor S. Sethi and
to the Editor-in-Chief, Professor K.L. Teo, apologizing for not indicating that the
mathematical model, analyses and results of their article were primarily from the
following working paper:
'' S. Sethi, H. Yan and H. Zhang, ''Information Updated Supply Chain with
Service-level Constraints'', Working Paper, School of Management, University of
Texas at Dallas, 2003.
Citation:
Suresh P. Sethi, Houmin Yan, H. Y. Zhang. Corrigendum. Journal of Industrial & Management Optimization,
2005, 1
(4)
: 588-588.
doi: 10.3934/jimo.2005.1.588
2019 Impact Factor: 1.366
Tools
Metrics
Other articles
by authors
[Back to Top]