Citation: |
[1] |
S. Banerjee and A. Sharma, Optimal procurement and pricing policies for inventory models with price and time dependent seasonal demand, Mathematical and Computer Modeling, 51 (2010), 700-714.doi: 10.1016/j.mcm.2009.10.022. |
[2] |
W. M. Chan, R. N. Ibrahim and P. B. Lochert, A new EPQ model: Integrating lower pricing, rework and reject situations, Production Planning & Control, 14 (2003), 588-595. |
[3] |
K. K. Chen, M.-F. Wu, S. W. Chiu and C.-H. Lee, Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework, Expert Systems with Applications, 39 (2012), 2232-2235.doi: 10.1016/j.eswa.2011.08.030. |
[4] |
S. Chiu, H. Lin, M. Wu and J. Yang, Determining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues, ScienticaIranica, 18 (2011), 1537-1544.doi: 10.1016/j.scient.2011.09.008. |
[5] |
S. W. Chiu, D. C. Gong, C. L. Chiu and C. L. Chung, Joint Determination of the production lot size and number of shipments EPQ model with rework, Mathematical and Computational Applications, 16 (2011), 317-328. |
[6] |
S. W. Chiu, Y. S. P. Chiu and J. C. Yang, Combining an alternative multi delivery policy into economic lot size problem with partial rework, Expert Systems with Applications, 39 (2012), 2578-2583.doi: 10.1016/j.eswa.2011.08.112. |
[7] |
L. E. Cárdenas-Barrón, Economic production quantity with rework process at a single-stage manufacturing system with planned backorders, Computers & Industrial Engineering, 57 (2009), 1105-1113. |
[8] |
L. E. Cárdenas-Barrón, B. Sarkar and G. Trevino-Garza, An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments, Applied Mathematical Modelling, 37 (2013), 5549-5554.doi: 10.1016/j.apm.2012.10.017. |
[9] |
L. E. Cárdenas-Barrón, B. Sarkar and G. Trevino-Garza, Easy and improved algorithms to joint determination of the replenishment lot size and number of shipments for an EPQ model with rework, Mathematical and Computational Applications, 18 (2013), 132-138. |
[10] |
L. E. Cárdenas-Barrón, A. A. Taleizadeh and G. Trevino-Garza, An improved solution to the replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework, Expert Systems with Applications, 39 (2012), 13540-13546. |
[11] |
C. Y. Dye, A finite horizon deteriorating inventory model with two-phase pricing and time varying demand and cost under trade credit financing using particle swarm optimization, Swarm and Evolutionary Computation, 5 (2012), 37-53.doi: 10.1016/j.swevo.2012.03.002. |
[12] |
J. T. Hsu and L. F. Hsu, Two EPQ models with imperfect production processes, inspection errors, planned backorders, and sales returns, Computers & Industrial Engineering, 64 (2013), 389-402.doi: 10.1016/j.cie.2012.10.005. |
[13] |
F. W. Harris, How many parts to make at once, Factory, The Magazine of Management, 10 (1913), 135-136, 152. |
[14] |
A. M. M. Jamal and B. R. Sarker, An optimal batch size for a production system operating under a just-in-time delivery system, International Journal of Production Economics, 32 (1993), 255-260.doi: 10.1016/0925-5273(93)90072-S. |
[15] |
I. Konstantaras, K. Skouri and M. Y. Jaber, Inventory models for imperfect quality items with shortages and learning in inspection, Applied Mathematical Modelling, 36 (2012), 5334-5343.doi: 10.1016/j.apm.2011.12.005. |
[16] |
R. Maihami, K. Nakhai and I. Abadi, Joint control of inventory and its pricing for non-instantaneously deteriorating items under permissible delay in payments and partial backlogging, Mathematical and Computer Modelling, 55 (2012), 1722-1733.doi: 10.1016/j.mcm.2011.11.017. |
[17] |
S. Pal, M. K. Maiti and M. Maiti, An EPQ model with price discounted promotional demand in an imprecise planning horizon via Genetic Algorithm, Computers & Industrial Engineering, 57 (2009), 181-187.doi: 10.1016/j.cie.2008.11.016. |
[18] |
B. Pal, S. S. Sana and K. Chaudhuri, Multi-item EOQ model while demand is sales price and price break sensitive, Economic Modelling, 29 (2012), 2283-2288.doi: 10.1016/j.econmod.2012.06.039. |
[19] |
B. Pal, S. S. Sana and K. Chaudhuri, A multi-echelon supply chain model for reworkable items in multiple-markets with supply disruption, Economic Modelling, 29 (2012), 1891-1898.doi: 10.1016/j.econmod.2012.06.005. |
[20] |
S. Papachristos and K. Skouri, An inventory model with deteriorating items, quantity discount, pricing and time-dependent partial backlogging, International Journal of Production Economics, 83 (2003), 247-256.doi: 10.1016/S0925-5273(02)00332-8. |
[21] |
S. H. R. Pasandideh, S. T. Akhavan Niaki and J. Aryan Yeganeh, A parameter-tuned genetic algorithm for multi-product economic production quantity model with space constraint, discrete delivery orders and shortages, Advances in Engineering Software, 41 (2010), 306-314. |
[22] |
S. Ray, Y. Gerchak and E. M. Jewkes, Joint pricing and inventory policies for make-to-stock products with deterministic price-sensitive demand, International Journal of Production Economics, 97 (2005), 143-158.doi: 10.1016/j.ijpe.2004.06.054. |
[23] |
S. S. Sana, An economic order quantity model for nonconforming quality products, Service Science, 4 (2012), 331-348.doi: 10.1287/serv.1120.0027. |
[24] |
S. S. Sana, Sales team's initiatives and stock sensitive demand - A production control policy, Economic Modelling, 31 (2013), 783-788.doi: 10.1016/j.econmod.2013.01.026. |
[25] |
S. S. Sana, Optimal production lot size and reorder point of a two-stage supply chain while random demand is sensitive with sales teams' initiatives, International Journal of Systems Science, (2014), p85.doi: 10.1080/00207721.2014.886748. |
[26] |
S. S. Sana, A production-inventory model of imperfect quality products in a three-layer supply chain, Decision Support Systems, 50 (2011), 539-547.doi: 10.1016/j.dss.2010.11.012. |
[27] |
S. S. Sana, A production-inventory model in an imperfect production process, European Journal of Operational Research, 200 (2010), 451-464.doi: 10.1016/j.ejor.2009.01.041. |
[28] |
A. A. Taleizadeh, H. M. Wee and S. G. Jalali-Naini, Economic production quantity model with repair failure and limited capacity, Applied Mathematical Modelling, 37 (2013), 2765-2774.doi: 10.1016/j.apm.2012.06.006. |
[29] |
A. A. Taleizadeh, S. T. AkhavanNiaki and A. A. Najafi, Multi product single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint, Journal of Computational and Applied Mathematics, 233 (2010), 1834-1849.doi: 10.1016/j.cam.2009.09.021. |
[30] |
A. A. Taleizadeh, L. E. Cárdenas-Barrón, J. Biabani and R. Nikousokh, Multi products single machine EPQ model with immediate rework process, International Journal of Industrial Engineering Computations, 3 (2012), 93-102.doi: 10.5267/j.ijiec.2011.09.001. |
[31] |
G. Trevino-Garza, K. Castillo-Villar and L. E. CCárdenas-Barrón, Joint determination of the lot size and number of shipments for a family of integrated vendor-buyer systems considering defective products, International Journal of Systems Science, (2014), p29.doi: 10.1080/00207721.2014.886750. |
[32] |
D. M. Tsai, Economic production quantity concerning learning and the reworking of imperfect items, Yugoslav Journal of Operations Research, 22 (2012), 313-336.doi: 10.2298/YJOR091109012T. |
[33] |
A. Yassine, B. Maddah and M. Salameh, Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model, International Journal of Production Economics, 135 (2012), 345-352.doi: 10.1016/j.ijpe.2011.08.010. |