Comparative analysis of supply chain financing strategies between different financing modes
- JIMO Home
- This Issue
-
Next Article
Production planning in a three-stock reverse-logistics system with deteriorating items under a continuous review policy
Determining optimal price, replenishment lot size and number of shipments for an EPQ model with rework and multiple shipments
1. | School of Industrial Engineering, College of Engineering, University of Tehran, Tehran, Iran |
2. | School of Industrial and Systems Engineering, College of Engineering, University of Tehran, Tehran, Iran |
3. | School of Engineering and Sciences, Tecnológico de Monterrey, E. Garza Sada 2501 Sur, C.P. 64849, Monterrey, Nuevo León, Mexico |
References:
[1] |
S. Banerjee and A. Sharma, Optimal procurement and pricing policies for inventory models with price and time dependent seasonal demand,, Mathematical and Computer Modeling, 51 (2010), 700.
doi: 10.1016/j.mcm.2009.10.022. |
[2] |
W. M. Chan, R. N. Ibrahim and P. B. Lochert, A new EPQ model: Integrating lower pricing, rework and reject situations,, Production Planning & Control, 14 (2003), 588. Google Scholar |
[3] |
K. K. Chen, M.-F. Wu, S. W. Chiu and C.-H. Lee, Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework,, Expert Systems with Applications, 39 (2012), 2232.
doi: 10.1016/j.eswa.2011.08.030. |
[4] |
S. Chiu, H. Lin, M. Wu and J. Yang, Determining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues,, ScienticaIranica, 18 (2011), 1537.
doi: 10.1016/j.scient.2011.09.008. |
[5] |
S. W. Chiu, D. C. Gong, C. L. Chiu and C. L. Chung, Joint Determination of the production lot size and number of shipments EPQ model with rework,, Mathematical and Computational Applications, 16 (2011), 317. Google Scholar |
[6] |
S. W. Chiu, Y. S. P. Chiu and J. C. Yang, Combining an alternative multi delivery policy into economic lot size problem with partial rework,, Expert Systems with Applications, 39 (2012), 2578.
doi: 10.1016/j.eswa.2011.08.112. |
[7] |
L. E. Cárdenas-Barrón, Economic production quantity with rework process at a single-stage manufacturing system with planned backorders,, Computers & Industrial Engineering, 57 (2009), 1105. Google Scholar |
[8] |
L. E. Cárdenas-Barrón, B. Sarkar and G. Trevino-Garza, An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments,, Applied Mathematical Modelling, 37 (2013), 5549.
doi: 10.1016/j.apm.2012.10.017. |
[9] |
L. E. Cárdenas-Barrón, B. Sarkar and G. Trevino-Garza, Easy and improved algorithms to joint determination of the replenishment lot size and number of shipments for an EPQ model with rework,, Mathematical and Computational Applications, 18 (2013), 132. Google Scholar |
[10] |
L. E. Cárdenas-Barrón, A. A. Taleizadeh and G. Trevino-Garza, An improved solution to the replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework,, Expert Systems with Applications, 39 (2012), 13540. Google Scholar |
[11] |
C. Y. Dye, A finite horizon deteriorating inventory model with two-phase pricing and time varying demand and cost under trade credit financing using particle swarm optimization,, Swarm and Evolutionary Computation, 5 (2012), 37.
doi: 10.1016/j.swevo.2012.03.002. |
[12] |
J. T. Hsu and L. F. Hsu, Two EPQ models with imperfect production processes, inspection errors, planned backorders, and sales returns,, Computers & Industrial Engineering, 64 (2013), 389.
doi: 10.1016/j.cie.2012.10.005. |
[13] |
F. W. Harris, How many parts to make at once, Factory,, The Magazine of Management, 10 (1913), 135. Google Scholar |
[14] |
A. M. M. Jamal and B. R. Sarker, An optimal batch size for a production system operating under a just-in-time delivery system,, International Journal of Production Economics, 32 (1993), 255.
doi: 10.1016/0925-5273(93)90072-S. |
[15] |
I. Konstantaras, K. Skouri and M. Y. Jaber, Inventory models for imperfect quality items with shortages and learning in inspection,, Applied Mathematical Modelling, 36 (2012), 5334.
doi: 10.1016/j.apm.2011.12.005. |
[16] |
R. Maihami, K. Nakhai and I. Abadi, Joint control of inventory and its pricing for non-instantaneously deteriorating items under permissible delay in payments and partial backlogging,, Mathematical and Computer Modelling, 55 (2012), 1722.
doi: 10.1016/j.mcm.2011.11.017. |
[17] |
S. Pal, M. K. Maiti and M. Maiti, An EPQ model with price discounted promotional demand in an imprecise planning horizon via Genetic Algorithm,, Computers & Industrial Engineering, 57 (2009), 181.
doi: 10.1016/j.cie.2008.11.016. |
[18] |
B. Pal, S. S. Sana and K. Chaudhuri, Multi-item EOQ model while demand is sales price and price break sensitive,, Economic Modelling, 29 (2012), 2283.
doi: 10.1016/j.econmod.2012.06.039. |
[19] |
B. Pal, S. S. Sana and K. Chaudhuri, A multi-echelon supply chain model for reworkable items in multiple-markets with supply disruption,, Economic Modelling, 29 (2012), 1891.
doi: 10.1016/j.econmod.2012.06.005. |
[20] |
S. Papachristos and K. Skouri, An inventory model with deteriorating items, quantity discount, pricing and time-dependent partial backlogging,, International Journal of Production Economics, 83 (2003), 247.
doi: 10.1016/S0925-5273(02)00332-8. |
[21] |
S. H. R. Pasandideh, S. T. Akhavan Niaki and J. Aryan Yeganeh, A parameter-tuned genetic algorithm for multi-product economic production quantity model with space constraint, discrete delivery orders and shortages,, Advances in Engineering Software, 41 (2010), 306. Google Scholar |
[22] |
S. Ray, Y. Gerchak and E. M. Jewkes, Joint pricing and inventory policies for make-to-stock products with deterministic price-sensitive demand,, International Journal of Production Economics, 97 (2005), 143.
doi: 10.1016/j.ijpe.2004.06.054. |
[23] |
S. S. Sana, An economic order quantity model for nonconforming quality products,, Service Science, 4 (2012), 331.
doi: 10.1287/serv.1120.0027. |
[24] |
S. S. Sana, Sales team's initiatives and stock sensitive demand - A production control policy,, Economic Modelling, 31 (2013), 783.
doi: 10.1016/j.econmod.2013.01.026. |
[25] |
S. S. Sana, Optimal production lot size and reorder point of a two-stage supply chain while random demand is sensitive with sales teams' initiatives,, International Journal of Systems Science, (2014).
doi: 10.1080/00207721.2014.886748. |
[26] |
S. S. Sana, A production-inventory model of imperfect quality products in a three-layer supply chain,, Decision Support Systems, 50 (2011), 539.
doi: 10.1016/j.dss.2010.11.012. |
[27] |
S. S. Sana, A production-inventory model in an imperfect production process,, European Journal of Operational Research, 200 (2010), 451.
doi: 10.1016/j.ejor.2009.01.041. |
[28] |
A. A. Taleizadeh, H. M. Wee and S. G. Jalali-Naini, Economic production quantity model with repair failure and limited capacity,, Applied Mathematical Modelling, 37 (2013), 2765.
doi: 10.1016/j.apm.2012.06.006. |
[29] |
A. A. Taleizadeh, S. T. AkhavanNiaki and A. A. Najafi, Multi product single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint,, Journal of Computational and Applied Mathematics, 233 (2010), 1834.
doi: 10.1016/j.cam.2009.09.021. |
[30] |
A. A. Taleizadeh, L. E. Cárdenas-Barrón, J. Biabani and R. Nikousokh, Multi products single machine EPQ model with immediate rework process,, International Journal of Industrial Engineering Computations, 3 (2012), 93.
doi: 10.5267/j.ijiec.2011.09.001. |
[31] |
G. Trevino-Garza, K. Castillo-Villar and L. E. CCárdenas-Barrón, Joint determination of the lot size and number of shipments for a family of integrated vendor-buyer systems considering defective products,, International Journal of Systems Science, (2014).
doi: 10.1080/00207721.2014.886750. |
[32] |
D. M. Tsai, Economic production quantity concerning learning and the reworking of imperfect items,, Yugoslav Journal of Operations Research, 22 (2012), 313.
doi: 10.2298/YJOR091109012T. |
[33] |
A. Yassine, B. Maddah and M. Salameh, Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model,, International Journal of Production Economics, 135 (2012), 345.
doi: 10.1016/j.ijpe.2011.08.010. |
show all references
References:
[1] |
S. Banerjee and A. Sharma, Optimal procurement and pricing policies for inventory models with price and time dependent seasonal demand,, Mathematical and Computer Modeling, 51 (2010), 700.
doi: 10.1016/j.mcm.2009.10.022. |
[2] |
W. M. Chan, R. N. Ibrahim and P. B. Lochert, A new EPQ model: Integrating lower pricing, rework and reject situations,, Production Planning & Control, 14 (2003), 588. Google Scholar |
[3] |
K. K. Chen, M.-F. Wu, S. W. Chiu and C.-H. Lee, Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework,, Expert Systems with Applications, 39 (2012), 2232.
doi: 10.1016/j.eswa.2011.08.030. |
[4] |
S. Chiu, H. Lin, M. Wu and J. Yang, Determining replenishment lot size and shipment policy for an extended EPQ model with delivery and quality assurance issues,, ScienticaIranica, 18 (2011), 1537.
doi: 10.1016/j.scient.2011.09.008. |
[5] |
S. W. Chiu, D. C. Gong, C. L. Chiu and C. L. Chung, Joint Determination of the production lot size and number of shipments EPQ model with rework,, Mathematical and Computational Applications, 16 (2011), 317. Google Scholar |
[6] |
S. W. Chiu, Y. S. P. Chiu and J. C. Yang, Combining an alternative multi delivery policy into economic lot size problem with partial rework,, Expert Systems with Applications, 39 (2012), 2578.
doi: 10.1016/j.eswa.2011.08.112. |
[7] |
L. E. Cárdenas-Barrón, Economic production quantity with rework process at a single-stage manufacturing system with planned backorders,, Computers & Industrial Engineering, 57 (2009), 1105. Google Scholar |
[8] |
L. E. Cárdenas-Barrón, B. Sarkar and G. Trevino-Garza, An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments,, Applied Mathematical Modelling, 37 (2013), 5549.
doi: 10.1016/j.apm.2012.10.017. |
[9] |
L. E. Cárdenas-Barrón, B. Sarkar and G. Trevino-Garza, Easy and improved algorithms to joint determination of the replenishment lot size and number of shipments for an EPQ model with rework,, Mathematical and Computational Applications, 18 (2013), 132. Google Scholar |
[10] |
L. E. Cárdenas-Barrón, A. A. Taleizadeh and G. Trevino-Garza, An improved solution to the replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial rework,, Expert Systems with Applications, 39 (2012), 13540. Google Scholar |
[11] |
C. Y. Dye, A finite horizon deteriorating inventory model with two-phase pricing and time varying demand and cost under trade credit financing using particle swarm optimization,, Swarm and Evolutionary Computation, 5 (2012), 37.
doi: 10.1016/j.swevo.2012.03.002. |
[12] |
J. T. Hsu and L. F. Hsu, Two EPQ models with imperfect production processes, inspection errors, planned backorders, and sales returns,, Computers & Industrial Engineering, 64 (2013), 389.
doi: 10.1016/j.cie.2012.10.005. |
[13] |
F. W. Harris, How many parts to make at once, Factory,, The Magazine of Management, 10 (1913), 135. Google Scholar |
[14] |
A. M. M. Jamal and B. R. Sarker, An optimal batch size for a production system operating under a just-in-time delivery system,, International Journal of Production Economics, 32 (1993), 255.
doi: 10.1016/0925-5273(93)90072-S. |
[15] |
I. Konstantaras, K. Skouri and M. Y. Jaber, Inventory models for imperfect quality items with shortages and learning in inspection,, Applied Mathematical Modelling, 36 (2012), 5334.
doi: 10.1016/j.apm.2011.12.005. |
[16] |
R. Maihami, K. Nakhai and I. Abadi, Joint control of inventory and its pricing for non-instantaneously deteriorating items under permissible delay in payments and partial backlogging,, Mathematical and Computer Modelling, 55 (2012), 1722.
doi: 10.1016/j.mcm.2011.11.017. |
[17] |
S. Pal, M. K. Maiti and M. Maiti, An EPQ model with price discounted promotional demand in an imprecise planning horizon via Genetic Algorithm,, Computers & Industrial Engineering, 57 (2009), 181.
doi: 10.1016/j.cie.2008.11.016. |
[18] |
B. Pal, S. S. Sana and K. Chaudhuri, Multi-item EOQ model while demand is sales price and price break sensitive,, Economic Modelling, 29 (2012), 2283.
doi: 10.1016/j.econmod.2012.06.039. |
[19] |
B. Pal, S. S. Sana and K. Chaudhuri, A multi-echelon supply chain model for reworkable items in multiple-markets with supply disruption,, Economic Modelling, 29 (2012), 1891.
doi: 10.1016/j.econmod.2012.06.005. |
[20] |
S. Papachristos and K. Skouri, An inventory model with deteriorating items, quantity discount, pricing and time-dependent partial backlogging,, International Journal of Production Economics, 83 (2003), 247.
doi: 10.1016/S0925-5273(02)00332-8. |
[21] |
S. H. R. Pasandideh, S. T. Akhavan Niaki and J. Aryan Yeganeh, A parameter-tuned genetic algorithm for multi-product economic production quantity model with space constraint, discrete delivery orders and shortages,, Advances in Engineering Software, 41 (2010), 306. Google Scholar |
[22] |
S. Ray, Y. Gerchak and E. M. Jewkes, Joint pricing and inventory policies for make-to-stock products with deterministic price-sensitive demand,, International Journal of Production Economics, 97 (2005), 143.
doi: 10.1016/j.ijpe.2004.06.054. |
[23] |
S. S. Sana, An economic order quantity model for nonconforming quality products,, Service Science, 4 (2012), 331.
doi: 10.1287/serv.1120.0027. |
[24] |
S. S. Sana, Sales team's initiatives and stock sensitive demand - A production control policy,, Economic Modelling, 31 (2013), 783.
doi: 10.1016/j.econmod.2013.01.026. |
[25] |
S. S. Sana, Optimal production lot size and reorder point of a two-stage supply chain while random demand is sensitive with sales teams' initiatives,, International Journal of Systems Science, (2014).
doi: 10.1080/00207721.2014.886748. |
[26] |
S. S. Sana, A production-inventory model of imperfect quality products in a three-layer supply chain,, Decision Support Systems, 50 (2011), 539.
doi: 10.1016/j.dss.2010.11.012. |
[27] |
S. S. Sana, A production-inventory model in an imperfect production process,, European Journal of Operational Research, 200 (2010), 451.
doi: 10.1016/j.ejor.2009.01.041. |
[28] |
A. A. Taleizadeh, H. M. Wee and S. G. Jalali-Naini, Economic production quantity model with repair failure and limited capacity,, Applied Mathematical Modelling, 37 (2013), 2765.
doi: 10.1016/j.apm.2012.06.006. |
[29] |
A. A. Taleizadeh, S. T. AkhavanNiaki and A. A. Najafi, Multi product single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint,, Journal of Computational and Applied Mathematics, 233 (2010), 1834.
doi: 10.1016/j.cam.2009.09.021. |
[30] |
A. A. Taleizadeh, L. E. Cárdenas-Barrón, J. Biabani and R. Nikousokh, Multi products single machine EPQ model with immediate rework process,, International Journal of Industrial Engineering Computations, 3 (2012), 93.
doi: 10.5267/j.ijiec.2011.09.001. |
[31] |
G. Trevino-Garza, K. Castillo-Villar and L. E. CCárdenas-Barrón, Joint determination of the lot size and number of shipments for a family of integrated vendor-buyer systems considering defective products,, International Journal of Systems Science, (2014).
doi: 10.1080/00207721.2014.886750. |
[32] |
D. M. Tsai, Economic production quantity concerning learning and the reworking of imperfect items,, Yugoslav Journal of Operations Research, 22 (2012), 313.
doi: 10.2298/YJOR091109012T. |
[33] |
A. Yassine, B. Maddah and M. Salameh, Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model,, International Journal of Production Economics, 135 (2012), 345.
doi: 10.1016/j.ijpe.2011.08.010. |
[1] |
Guodong Yi, Xiaohong Chen, Chunqiao Tan. Optimal pricing of perishable products with replenishment policy in the presence of strategic consumers. Journal of Industrial & Management Optimization, 2019, 15 (4) : 1579-1597. doi: 10.3934/jimo.2018112 |
[2] |
Musen Xue, Guowei Zhu. Partial myopia vs. forward-looking behaviors in a dynamic pricing and replenishment model for perishable items. Journal of Industrial & Management Optimization, 2021, 17 (2) : 633-648. doi: 10.3934/jimo.2019126 |
[3] |
Jun Li, Hairong Feng, Mingchao Wang. A replenishment policy with defective products, backlog and delay of payments. Journal of Industrial & Management Optimization, 2009, 5 (4) : 867-880. doi: 10.3934/jimo.2009.5.867 |
[4] |
Sebastián Ferrer, Francisco Crespo. Parametric quartic Hamiltonian model. A unified treatment of classic integrable systems. Journal of Geometric Mechanics, 2014, 6 (4) : 479-502. doi: 10.3934/jgm.2014.6.479 |
[5] |
Ghendrih Philippe, Hauray Maxime, Anne Nouri. Derivation of a gyrokinetic model. Existence and uniqueness of specific stationary solution. Kinetic & Related Models, 2009, 2 (4) : 707-725. doi: 10.3934/krm.2009.2.707 |
[6] |
Jun Li, Hairong Feng, Kun-Jen Chung. Using the algebraic approach to determine the replenishment optimal policy with defective products, backlog and delay of payments in the supply chain management. Journal of Industrial & Management Optimization, 2012, 8 (1) : 263-269. doi: 10.3934/jimo.2012.8.263 |
[7] |
Po-Chung Yang, Hui-Ming Wee, Shen-Lian Chung, Yong-Yan Huang. Pricing and replenishment strategy for a multi-market deteriorating product with time-varying and price-sensitive demand. Journal of Industrial & Management Optimization, 2013, 9 (4) : 769-787. doi: 10.3934/jimo.2013.9.769 |
[8] |
Jianxiong Zhang, Zhenyu Bai, Wansheng Tang. Optimal pricing policy for deteriorating items with preservation technology investment. Journal of Industrial & Management Optimization, 2014, 10 (4) : 1261-1277. doi: 10.3934/jimo.2014.10.1261 |
[9] |
Qi Feng, Suresh P. Sethi, Houmin Yan, Hanqin Zhang. Optimality and nonoptimality of the base-stock policy in inventory problems with multiple delivery modes. Journal of Industrial & Management Optimization, 2006, 2 (1) : 19-42. doi: 10.3934/jimo.2006.2.19 |
[10] |
Pin-Shou Ting. The EPQ model with deteriorating items under two levels of trade credit in a supply chain system. Journal of Industrial & Management Optimization, 2015, 11 (2) : 479-492. doi: 10.3934/jimo.2015.11.479 |
[11] |
Faker Ben Belgacem. Uniqueness for an ill-posed reaction-dispersion model. Application to organic pollution in stream-waters. Inverse Problems & Imaging, 2012, 6 (2) : 163-181. doi: 10.3934/ipi.2012.6.163 |
[12] |
Katherinne Salas Navarro, Jaime Acevedo Chedid, Whady F. Florez, Holman Ospina Mateus, Leopoldo Eduardo Cárdenas-Barrón, Shib Sankar Sana. A collaborative EPQ inventory model for a three-echelon supply chain with multiple products considering the effect of marketing effort on demand. Journal of Industrial & Management Optimization, 2020, 16 (4) : 1613-1633. doi: 10.3934/jimo.2019020 |
[13] |
Maryam Ghoreishi, Abolfazl Mirzazadeh, Gerhard-Wilhelm Weber, Isa Nakhai-Kamalabadi. Joint pricing and replenishment decisions for non-instantaneous deteriorating items with partial backlogging, inflation- and selling price-dependent demand and customer returns. Journal of Industrial & Management Optimization, 2015, 11 (3) : 933-949. doi: 10.3934/jimo.2015.11.933 |
[14] |
Jiayu Shen, Yuanguo Zhu. An uncertain programming model for single machine scheduling problem with batch delivery. Journal of Industrial & Management Optimization, 2019, 15 (2) : 577-593. doi: 10.3934/jimo.2018058 |
[15] |
Bing-Bing Cao, Zhi-Ping Fan, Tian-Hui You. The optimal pricing and ordering policy for temperature sensitive products considering the effects of temperature on demand. Journal of Industrial & Management Optimization, 2019, 15 (3) : 1153-1184. doi: 10.3934/jimo.2018090 |
[16] |
Martin Bohner, Sabrina Streipert. Optimal harvesting policy for the Beverton--Holt model. Mathematical Biosciences & Engineering, 2016, 13 (4) : 673-695. doi: 10.3934/mbe.2016014 |
[17] |
Cuilian You, Le Bo. Option pricing formulas for generalized fuzzy stock model. Journal of Industrial & Management Optimization, 2020, 16 (1) : 387-396. doi: 10.3934/jimo.2018158 |
[18] |
Bing-Bing Cao, Zai-Jing Gong, Tian-Hui You. Stackelberg pricing policy in dyadic capital-constrained supply chain considering bank's deposit and loan based on delay payment scheme. Journal of Industrial & Management Optimization, 2020 doi: 10.3934/jimo.2020098 |
[19] |
Donatella Donatelli, Bernard Ducomet, Šárka Nečasová. Low Mach number limit for a model of accretion disk. Discrete & Continuous Dynamical Systems - A, 2018, 38 (7) : 3239-3268. doi: 10.3934/dcds.2018141 |
[20] |
Dayi He, Xiaoling Chen, Qi Huang. Influences of carbon emission abatement on firms' production policy based on newsboy model. Journal of Industrial & Management Optimization, 2017, 13 (1) : 251-265. doi: 10.3934/jimo.2016015 |