The interaction between BIM's promotion and interest game under information asymmetry
- JIMO Home
- This Issue
-
Next Article
Portfolio optimization using a new probabilistic risk measure
A multidimensional information model for managing construction information
1. | State Key Laboratory of Hydraulic Engineering Simulation, and Safety at Tianjin University, Tianjin, China, China, China, China |
2. | State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300072, China |
References:
[1] |
O. Abudayyeh, B. Temel, H. Al-Tabtabai and B. Hurley, An intranet-based cost control system, Advances in Engineering Software, 32 (2001), 87-94.
doi: 10.1016/S0965-9978(00)00094-6. |
[2] |
R. Agrawal, A. Gupta and S. Sarawagi, Modeling multidimensional databases, Data Engineering, (1997), 232-243.
doi: 10.1109/ICDE.1997.581777. |
[3] |
B. C. Björk, The impact of electronic document management on construction information management, Proc. of the International Council for Research and Innovation in Building and Construction, (2002), 12-14. |
[4] |
B. Burcin, K. Ku and F. Jazizadeh, BIM-enabled virtual and collaborative construction engineering and management, Journal of Professional Issues in Engineering Education, 138 (2012), 234-245. |
[5] |
R. Campbell, It All Ends in Tiers, SIGC Application Development Advisor, 1997. |
[6] |
A. P. Chassiakos and S. P. Sakellaropoulos, A web-based system for managing construction information, Advances in Engineering Software, 39 (2008), 865-876.
doi: 10.1016/j.advengsoft.2008.05.006. |
[7] |
S. O. Cheung, H. C Suen and K. K. Cheung, PPMS: a web-based construction project performance monitoring system, Automation in Construction, 13 (2004), 361-376.
doi: 10.1016/j.autcon.2003.12.001. |
[8] |
D. K. Chua and M. Godinot, Use of a WBS matrix to improve interface management in projects, Journal of construction engineering and management, 132 (2006), 67-79.
doi: 10.1061/(ASCE)0733-9364(2006)132:1(67). |
[9] |
N. Dawood, A. Akinsola and B. Hobbs, Development of automated communication of system for managing site information using internet technology, Automation in Construction, 11 (2002), 557-572.
doi: 10.1016/S0926-5805(01)00066-8. |
[10] |
L. Y. Ding, Y. Zhou and H. B. Luo, Using nD technology to develop an integrated construction management system for city rail transit construction, Automation in Construction, 21 (2012), 64-73.
doi: 10.1016/j.autcon.2011.05.013. |
[11] |
C. García, G. Garci-aaa, F. Sarria and D. Echeverry, Internet-based solutions to the fragmentation of the construction process, Computing in Civil Engineering, (1998), 573-576. |
[12] |
D. Hajjar and S. M. AbouRizk, Integrating document management with project and company data, Journal of Computing in civil Engineering, 14 (2000), 70-77.
doi: 10.1061/(ASCE)0887-3801(2000)14:1(70). |
[13] |
J. Han, M. Kamber and J. Pei, Data Mining: Concepts And Techniques, $3^{nd}$ edition, Morgan kaufmann, New York, 2012. |
[14] |
L. Khemlani, Top Criteria for BIM Solutions: AECBytes Survey Results, AECbytes Special Report, AECbytes, 2007. |
[15] |
S. Liu, C. A. McMahon and S. J. Culley, A review of structured document retrieval (SDR) technology to improve information access performance in engineering document management, Computers in Industry, 59 (2008), 3-16.
doi: 10.1016/j.compind.2007.08.001. |
[16] |
Z. L. Ma, H. Li, Q. P. Shen and J. Yang, Using XML to support information exchange in construction projects, Automation in Construction, 13 (2004), 629-637. |
[17] |
T. Madhusudan, J. L. Zhao and B. Marshall, A case based reasoning framework for workflow model management, Data & Knowledge Engineering, 50 (2004), 87-115.
doi: 10.1016/j.datak.2004.01.005. |
[18] |
A. H. Mokhtar, Coordinating and customizing design information through the internet, Eng Construct Architect Manage, 9 (2001), 222-231.
doi: 10.1046/j.1365-232X.2002.00257.x. |
[19] |
P. Nitithamyong and M. J. Skibniewski, Web-based construction project management systems: How to make them successful?, Automation in construction, 13 (2004), 491-506.
doi: 10.1016/j.autcon.2004.02.003. |
[20] |
P. Nitithamyong and M. J. Skibniewski, Success/failure factors and performance measures of web-based construction project management systems: professionals' viewpoint, Journal of construction engineering and management, 132 (2006), 80-87.
doi: 10.1061/(ASCE)0733-9364(2006)132:1(80). |
[21] |
P. Nitithamyong and M. J. Skibniewski, Key success/failure factors and their impacts on system performance of web-based project management systems in construction, ITcon, 12 (2007), 39-59. |
[22] |
R. Orfali, D. Harkey and J. Edwards, CORBA, Java, and the Object Web, BYTE, 2 (1997), 95-100. |
[23] |
D. Pountain and J. Montgomery, Web components, BYTE, 2 (1997), 56-68. |
[24] |
A. Qady and A. Kandil, Document Management in Construction: Practices and Opinions, Journal of Construction Engineering and Management, 2013. |
[25] |
Y. Rezgui and P. Debras, An Integrated Approach for a Model Based Document Production and Management, Electronic Journal of Information Technology in Construction, 1996. |
[26] |
M. J. Skibniewski and G. A. Vecino, Web-based project management framework for dredging projects, Journal of Management in Engineering, 28 (2011), 127-139.
doi: 10.1061/(ASCE)ME.1943-5479.0000070. |
[27] |
V. D. A. Wil and K. M. V. Hee, Workflow Management, MIT Press, Massachusetts, 2002. |
[28] |
Y. N. Wu and N. Yao, Framework system design of construction project document management during the initial phase based on WBS, Wireless Communications, Networking and Mobile Computing, (2007), 5248-5251.
doi: 10.1109/WICOM.2007.1285. |
[29] |
Y. Zhou, L. Y. Ding and L. J. Chen, Application of 4D visualization technology for safety management in metro construction, Automation in Construction, 34 (2013), 25-36.
doi: 10.1016/j.autcon.2012.10.011. |
[30] |
Y. Zhu and R. A. Raja, Viewer controllable visualization for construction document processing, Automation in Construction, 12 (2003), 255-269.
doi: 10.1016/S0926-5805(02)00089-4. |
show all references
References:
[1] |
O. Abudayyeh, B. Temel, H. Al-Tabtabai and B. Hurley, An intranet-based cost control system, Advances in Engineering Software, 32 (2001), 87-94.
doi: 10.1016/S0965-9978(00)00094-6. |
[2] |
R. Agrawal, A. Gupta and S. Sarawagi, Modeling multidimensional databases, Data Engineering, (1997), 232-243.
doi: 10.1109/ICDE.1997.581777. |
[3] |
B. C. Björk, The impact of electronic document management on construction information management, Proc. of the International Council for Research and Innovation in Building and Construction, (2002), 12-14. |
[4] |
B. Burcin, K. Ku and F. Jazizadeh, BIM-enabled virtual and collaborative construction engineering and management, Journal of Professional Issues in Engineering Education, 138 (2012), 234-245. |
[5] |
R. Campbell, It All Ends in Tiers, SIGC Application Development Advisor, 1997. |
[6] |
A. P. Chassiakos and S. P. Sakellaropoulos, A web-based system for managing construction information, Advances in Engineering Software, 39 (2008), 865-876.
doi: 10.1016/j.advengsoft.2008.05.006. |
[7] |
S. O. Cheung, H. C Suen and K. K. Cheung, PPMS: a web-based construction project performance monitoring system, Automation in Construction, 13 (2004), 361-376.
doi: 10.1016/j.autcon.2003.12.001. |
[8] |
D. K. Chua and M. Godinot, Use of a WBS matrix to improve interface management in projects, Journal of construction engineering and management, 132 (2006), 67-79.
doi: 10.1061/(ASCE)0733-9364(2006)132:1(67). |
[9] |
N. Dawood, A. Akinsola and B. Hobbs, Development of automated communication of system for managing site information using internet technology, Automation in Construction, 11 (2002), 557-572.
doi: 10.1016/S0926-5805(01)00066-8. |
[10] |
L. Y. Ding, Y. Zhou and H. B. Luo, Using nD technology to develop an integrated construction management system for city rail transit construction, Automation in Construction, 21 (2012), 64-73.
doi: 10.1016/j.autcon.2011.05.013. |
[11] |
C. García, G. Garci-aaa, F. Sarria and D. Echeverry, Internet-based solutions to the fragmentation of the construction process, Computing in Civil Engineering, (1998), 573-576. |
[12] |
D. Hajjar and S. M. AbouRizk, Integrating document management with project and company data, Journal of Computing in civil Engineering, 14 (2000), 70-77.
doi: 10.1061/(ASCE)0887-3801(2000)14:1(70). |
[13] |
J. Han, M. Kamber and J. Pei, Data Mining: Concepts And Techniques, $3^{nd}$ edition, Morgan kaufmann, New York, 2012. |
[14] |
L. Khemlani, Top Criteria for BIM Solutions: AECBytes Survey Results, AECbytes Special Report, AECbytes, 2007. |
[15] |
S. Liu, C. A. McMahon and S. J. Culley, A review of structured document retrieval (SDR) technology to improve information access performance in engineering document management, Computers in Industry, 59 (2008), 3-16.
doi: 10.1016/j.compind.2007.08.001. |
[16] |
Z. L. Ma, H. Li, Q. P. Shen and J. Yang, Using XML to support information exchange in construction projects, Automation in Construction, 13 (2004), 629-637. |
[17] |
T. Madhusudan, J. L. Zhao and B. Marshall, A case based reasoning framework for workflow model management, Data & Knowledge Engineering, 50 (2004), 87-115.
doi: 10.1016/j.datak.2004.01.005. |
[18] |
A. H. Mokhtar, Coordinating and customizing design information through the internet, Eng Construct Architect Manage, 9 (2001), 222-231.
doi: 10.1046/j.1365-232X.2002.00257.x. |
[19] |
P. Nitithamyong and M. J. Skibniewski, Web-based construction project management systems: How to make them successful?, Automation in construction, 13 (2004), 491-506.
doi: 10.1016/j.autcon.2004.02.003. |
[20] |
P. Nitithamyong and M. J. Skibniewski, Success/failure factors and performance measures of web-based construction project management systems: professionals' viewpoint, Journal of construction engineering and management, 132 (2006), 80-87.
doi: 10.1061/(ASCE)0733-9364(2006)132:1(80). |
[21] |
P. Nitithamyong and M. J. Skibniewski, Key success/failure factors and their impacts on system performance of web-based project management systems in construction, ITcon, 12 (2007), 39-59. |
[22] |
R. Orfali, D. Harkey and J. Edwards, CORBA, Java, and the Object Web, BYTE, 2 (1997), 95-100. |
[23] |
D. Pountain and J. Montgomery, Web components, BYTE, 2 (1997), 56-68. |
[24] |
A. Qady and A. Kandil, Document Management in Construction: Practices and Opinions, Journal of Construction Engineering and Management, 2013. |
[25] |
Y. Rezgui and P. Debras, An Integrated Approach for a Model Based Document Production and Management, Electronic Journal of Information Technology in Construction, 1996. |
[26] |
M. J. Skibniewski and G. A. Vecino, Web-based project management framework for dredging projects, Journal of Management in Engineering, 28 (2011), 127-139.
doi: 10.1061/(ASCE)ME.1943-5479.0000070. |
[27] |
V. D. A. Wil and K. M. V. Hee, Workflow Management, MIT Press, Massachusetts, 2002. |
[28] |
Y. N. Wu and N. Yao, Framework system design of construction project document management during the initial phase based on WBS, Wireless Communications, Networking and Mobile Computing, (2007), 5248-5251.
doi: 10.1109/WICOM.2007.1285. |
[29] |
Y. Zhou, L. Y. Ding and L. J. Chen, Application of 4D visualization technology for safety management in metro construction, Automation in Construction, 34 (2013), 25-36.
doi: 10.1016/j.autcon.2012.10.011. |
[30] |
Y. Zhu and R. A. Raja, Viewer controllable visualization for construction document processing, Automation in Construction, 12 (2003), 255-269.
doi: 10.1016/S0926-5805(02)00089-4. |
[1] |
Reza Lotfi, Zahra Yadegari, Seyed Hossein Hosseini, Amir Hossein Khameneh, Erfan Babaee Tirkolaee, Gerhard-Wilhelm Weber. A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project. Journal of Industrial and Management Optimization, 2022, 18 (1) : 375-396. doi: 10.3934/jimo.2020158 |
[2] |
Shi'an Wang, N. U. Ahmed. Optimum management of the network of city bus routes based on a stochastic dynamic model. Journal of Industrial and Management Optimization, 2019, 15 (2) : 619-631. doi: 10.3934/jimo.2018061 |
[3] |
Andrew P. Sage. Risk in system of systems engineering and management. Journal of Industrial and Management Optimization, 2008, 4 (3) : 477-487. doi: 10.3934/jimo.2008.4.477 |
[4] |
Lianju Sun, Ziyou Gao, Yiju Wang. A Stackelberg game management model of the urban public transport. Journal of Industrial and Management Optimization, 2012, 8 (2) : 507-520. doi: 10.3934/jimo.2012.8.507 |
[5] |
Guirong Jiang, Qishao Lu, Linping Peng. Impulsive Ecological Control Of A Stage-Structured Pest Management System. Mathematical Biosciences & Engineering, 2005, 2 (2) : 329-344. doi: 10.3934/mbe.2005.2.329 |
[6] |
Eungab Kim. On the admission control and demand management in a two-station tandem production system. Journal of Industrial and Management Optimization, 2011, 7 (1) : 1-18. doi: 10.3934/jimo.2011.7.1 |
[7] |
Mourad Azi, Mohand Ouamer Bibi. Optimal control of a dynamical system with intermediate phase constraints and applications in cash management. Numerical Algebra, Control and Optimization, 2022, 12 (2) : 279-291. doi: 10.3934/naco.2021005 |
[8] |
Jemal Mohammed-Awel, Ruijun Zhao, Eric Numfor, Suzanne Lenhart. Management strategies in a malaria model combining human and transmission-blocking vaccines. Discrete and Continuous Dynamical Systems - B, 2017, 22 (3) : 977-1000. doi: 10.3934/dcdsb.2017049 |
[9] |
Guirong Pan, Bing Xue, Hongchun Sun. An optimization model and method for supply chain equilibrium management problem. Mathematical Foundations of Computing, 2022, 5 (2) : 145-156. doi: 10.3934/mfc.2022001 |
[10] |
Alexandre Bayen, Rinaldo M. Colombo, Paola Goatin, Benedetto Piccoli. Traffic modeling and management: Trends and perspectives. Discrete and Continuous Dynamical Systems - S, 2014, 7 (3) : i-ii. doi: 10.3934/dcdss.2014.7.3i |
[11] |
A. Marigo, Benedetto Piccoli. Cooperative controls for air traffic management. Communications on Pure and Applied Analysis, 2003, 2 (3) : 355-369. doi: 10.3934/cpaa.2003.2.355 |
[12] |
Xiaoxiao Li, Yingjing Shi, Rui Li, Shida Cao. Energy management method for an unpowered landing. Journal of Industrial and Management Optimization, 2022, 18 (2) : 825-841. doi: 10.3934/jimo.2020180 |
[13] |
Jian-Xin Guo, Xing-Long Qu. Robust control in green production management. Journal of Industrial and Management Optimization, 2022, 18 (2) : 1115-1132. doi: 10.3934/jimo.2021011 |
[14] |
Jiuping Xu, Pei Wei. Production-distribution planning of construction supply chain management under fuzzy random environment for large-scale construction projects. Journal of Industrial and Management Optimization, 2013, 9 (1) : 31-56. doi: 10.3934/jimo.2013.9.31 |
[15] |
Matteo Ludovico Bedini, Rainer Buckdahn, Hans-Jürgen Engelbert. On the compensator of the default process in an information-based model. Probability, Uncertainty and Quantitative Risk, 2017, 2 (0) : 10-. doi: 10.1186/s41546-017-0017-4 |
[16] |
Yeong-Cheng Liou, Siegfried Schaible, Jen-Chih Yao. Supply chain inventory management via a Stackelberg equilibrium. Journal of Industrial and Management Optimization, 2006, 2 (1) : 81-94. doi: 10.3934/jimo.2006.2.81 |
[17] |
Harald Held, Gabriela Martinez, Philipp Emanuel Stelzig. Stochastic programming approach for energy management in electric microgrids. Numerical Algebra, Control and Optimization, 2014, 4 (3) : 241-267. doi: 10.3934/naco.2014.4.241 |
[18] |
Sanyi Tang, Lansun Chen. Modelling and analysis of integrated pest management strategy. Discrete and Continuous Dynamical Systems - B, 2004, 4 (3) : 759-768. doi: 10.3934/dcdsb.2004.4.759 |
[19] |
Shuhua Zhang, Xinyu Wang, Hua Li. Modeling and computation of water management by real options. Journal of Industrial and Management Optimization, 2018, 14 (1) : 81-103. doi: 10.3934/jimo.2017038 |
[20] |
Andrew J. Whittle, Suzanne Lenhart, Louis J. Gross. Optimal control for management of an invasive plant species. Mathematical Biosciences & Engineering, 2007, 4 (1) : 101-112. doi: 10.3934/mbe.2007.4.101 |
2020 Impact Factor: 1.801
Tools
Metrics
Other articles
by authors
[Back to Top]