An MILP approach to multi-location, multi-period equipment selection for surface mining with case studies
1. | Department of Computing and Information Systems, University of Melbourne, Parkville, Australia |
2. | Western Australian Centre of Excellence in Industrial Optimisation, Curtin University of Technology, Bentley, Perth, Australia |
3. | Rio Tinto Technical Services, Perth, Australia, Australia |
References:
[1] |
S. Almutawa, M. Savsar and K. Al-Rashdan, Optimum machine selection in multistage manufacturing systems,, International Journal of Production Research, 43 (2005), 1109.
doi: 10.1080/00207540412331320544. |
[2] |
M. Baxter, M. Brown and H.-S. Gan, A decision support tool for equipment replacement in forestry harvesting operations,, in Proceedings of the 45th Annual Conference of the ORSNA, (2010), 363. Google Scholar |
[3] |
D. P. Bennett and C. A. Yano, A decomposition approach for an equipment selection and multiple product routing problem incorporating environmental factors,, European Journal of Operational Research, 156 (2004), 643.
doi: 10.1016/S0377-2217(03)00138-3. |
[4] |
C. Burt and L. Caccetta, Equipment selection for surface mining: A review,, Interfaces, 44 (2014), 143.
doi: 10.1287/inte.2013.0732. |
[5] |
C. Burt, L. Caccetta, P. Welgama and L. Fouché, Equipment selection with heterogeneous fleets for multiple period schedules,, Journal of the Operational Research Society, 62 (2010), 1498.
doi: 10.1057/jors.2010.107. |
[6] |
C. N. Burt and L. Caccetta, Match factor for heterogeneous truck and loader fleets,, International Journal of Mining, 21 (2007), 262.
doi: 10.1080/17480930701388606. |
[7] |
N. Çelebi, An equipment selection and cost analysis system for openpit coal mines,, International Journal of Surface Mining, 12 (1998), 181. Google Scholar |
[8] |
T. Cebesoy, Surface mining equipment cost analysis with a developed linear break even model,, International Journal of Surface Mining, 11 (1997), 53.
doi: 10.1080/09208119708944060. |
[9] |
M. Chen, A heuristic for solving manufacturing process and equipment selection problems,, International Journal of Production Research, 37 (1999), 359.
doi: 10.1080/002075499191814. |
[10] |
K. Dagdelen, E. Topal and M. Kuchta, Linear programming model applied to scheduling of iron ore production at the Kiruna mine, Sweden,, in Mine planning and equipment selection 2000 : Proceedings of the Ninth International Symposium on Mine Planning and Equipment Selection /Athens/Greece/6-9 November 2000 (eds. G. Panagiotou and T. Michalakopoulos), (2000), 6. Google Scholar |
[11] |
K. Dagdelen and M. W. Asad, Optimum cement quarry scheduling algorithm,, in Application of computers and operations research in the mineral industry (ed. S. Bandopadhyay), (2002), 697. Google Scholar |
[12] |
D. Edwards, H. Malekzadeh and S. Yisa, A linear programming decision tool for selecting the optimum excavator,, Structural Survey, 19 (2001), 113.
doi: 10.1108/EUM0000000005628. |
[13] |
S. Erçelebi and C. Kirmanli, Review of surface mining equipment selection techniques,, in Mine planning and equipment selection 2000: Proceedings of the Ninth International Symposium on Mine Planning and Equipment Selection /Athens/Greece/6-9 November 2000 (eds. G. Panagiotou and T. Michalakopoulos), (2000), 6. Google Scholar |
[14] |
M. Hassan, G. Hogg and D. Smith, A construction algorithm for the selection and assignment of materials handling equipment,, International Journal of Production Research, 23 (1985), 381.
doi: 10.1080/00207548508904715. |
[15] |
A. Jayawardane and F. Harris, Further development of integer programming in earthwork optimization,, Journal of Construction Engineering and Management, 116 (1990), 18. Google Scholar |
[16] |
T. B. Johnson, K. Dagdelen and S. Ramazan, Open pit mine scheduling based on fundamental tree algorithm,, in Application of computers and operations research in the mineral industry (ed. S. Bandopadhyay), (2002), 147. Google Scholar |
[17] |
M. Kumral and P. Dowd, A simulated annealing approach to mine production scheduling,, Journal of the Operational Research Society, 56 (2005), 922.
doi: 10.1057/palgrave.jors.2601902. |
[18] |
A. Michiotis, D. Xerocostas and N. Galitis, A new integrated system for selecting mining equipment,, Computers industrial engineering, 34 (1998), 391.
doi: 10.1016/S0360-8352(97)00164-2. |
[19] |
S. H. L. Mirhosseyni and P. Web, A hybrid fuzzy knowledge-based expert system and genetic algorithm for efficient selection and assignment of material handling equipment,, Expert Systems with Applications, 36 (2009), 11875.
doi: 10.1016/j.eswa.2009.04.014. |
[20] |
B. Morgan, Optimizing truck-loader matching,, in Mine Planning and Equipment Selection 1994 : Proceedings of the third International Symposium on Mine Planning and Equipment Selection, (1994), 18. Google Scholar |
[21] |
S. Rajagopalan, Capacity expansion and equipment replacement: A unified approach,, Operations Research, 46 (1998), 846.
doi: 10.1287/opre.46.6.846. |
[22] |
D. Raman, S. Nagalingam, B. Gurd and G. Lin, Quantity of material handling equipment - a queuing theory based approach,, Robotics and Computer-Integrated Manufacturing, 25 (2009), 348. Google Scholar |
[23] |
S. Ramazan and R. Dimitrakopoulos, Production scheduling optimisation in a nickel laterite deposit: MIP and LP applications and infeasibility in the presence of orebody variability,, in Twelfth International Symposium on Mine Planning & Equipment Selection MPES 2003 (eds. M. D. Kuruppu and P. A. Lilly), (2003), 3. Google Scholar |
[24] |
S. D. Smith, G. S. Wood and M. Gould, A new earthworks estimating methodology,, Construction Management and Economics, 18 (2000), 219.
doi: 10.1080/014461900370843. |
[25] |
E. Topal and S. Ramazan, A new MIP model for mine equipment scheduling by minimizing maintenance cost,, European Journal of Operational Research, 207 (2010), 1065.
doi: 10.1016/j.ejor.2010.05.037. |
[26] |
D. Webster and R. Reed, A material handling system selection model,, AIIE Transactions, 3 (1971), 13.
doi: 10.1080/05695557108974781. |
show all references
References:
[1] |
S. Almutawa, M. Savsar and K. Al-Rashdan, Optimum machine selection in multistage manufacturing systems,, International Journal of Production Research, 43 (2005), 1109.
doi: 10.1080/00207540412331320544. |
[2] |
M. Baxter, M. Brown and H.-S. Gan, A decision support tool for equipment replacement in forestry harvesting operations,, in Proceedings of the 45th Annual Conference of the ORSNA, (2010), 363. Google Scholar |
[3] |
D. P. Bennett and C. A. Yano, A decomposition approach for an equipment selection and multiple product routing problem incorporating environmental factors,, European Journal of Operational Research, 156 (2004), 643.
doi: 10.1016/S0377-2217(03)00138-3. |
[4] |
C. Burt and L. Caccetta, Equipment selection for surface mining: A review,, Interfaces, 44 (2014), 143.
doi: 10.1287/inte.2013.0732. |
[5] |
C. Burt, L. Caccetta, P. Welgama and L. Fouché, Equipment selection with heterogeneous fleets for multiple period schedules,, Journal of the Operational Research Society, 62 (2010), 1498.
doi: 10.1057/jors.2010.107. |
[6] |
C. N. Burt and L. Caccetta, Match factor for heterogeneous truck and loader fleets,, International Journal of Mining, 21 (2007), 262.
doi: 10.1080/17480930701388606. |
[7] |
N. Çelebi, An equipment selection and cost analysis system for openpit coal mines,, International Journal of Surface Mining, 12 (1998), 181. Google Scholar |
[8] |
T. Cebesoy, Surface mining equipment cost analysis with a developed linear break even model,, International Journal of Surface Mining, 11 (1997), 53.
doi: 10.1080/09208119708944060. |
[9] |
M. Chen, A heuristic for solving manufacturing process and equipment selection problems,, International Journal of Production Research, 37 (1999), 359.
doi: 10.1080/002075499191814. |
[10] |
K. Dagdelen, E. Topal and M. Kuchta, Linear programming model applied to scheduling of iron ore production at the Kiruna mine, Sweden,, in Mine planning and equipment selection 2000 : Proceedings of the Ninth International Symposium on Mine Planning and Equipment Selection /Athens/Greece/6-9 November 2000 (eds. G. Panagiotou and T. Michalakopoulos), (2000), 6. Google Scholar |
[11] |
K. Dagdelen and M. W. Asad, Optimum cement quarry scheduling algorithm,, in Application of computers and operations research in the mineral industry (ed. S. Bandopadhyay), (2002), 697. Google Scholar |
[12] |
D. Edwards, H. Malekzadeh and S. Yisa, A linear programming decision tool for selecting the optimum excavator,, Structural Survey, 19 (2001), 113.
doi: 10.1108/EUM0000000005628. |
[13] |
S. Erçelebi and C. Kirmanli, Review of surface mining equipment selection techniques,, in Mine planning and equipment selection 2000: Proceedings of the Ninth International Symposium on Mine Planning and Equipment Selection /Athens/Greece/6-9 November 2000 (eds. G. Panagiotou and T. Michalakopoulos), (2000), 6. Google Scholar |
[14] |
M. Hassan, G. Hogg and D. Smith, A construction algorithm for the selection and assignment of materials handling equipment,, International Journal of Production Research, 23 (1985), 381.
doi: 10.1080/00207548508904715. |
[15] |
A. Jayawardane and F. Harris, Further development of integer programming in earthwork optimization,, Journal of Construction Engineering and Management, 116 (1990), 18. Google Scholar |
[16] |
T. B. Johnson, K. Dagdelen and S. Ramazan, Open pit mine scheduling based on fundamental tree algorithm,, in Application of computers and operations research in the mineral industry (ed. S. Bandopadhyay), (2002), 147. Google Scholar |
[17] |
M. Kumral and P. Dowd, A simulated annealing approach to mine production scheduling,, Journal of the Operational Research Society, 56 (2005), 922.
doi: 10.1057/palgrave.jors.2601902. |
[18] |
A. Michiotis, D. Xerocostas and N. Galitis, A new integrated system for selecting mining equipment,, Computers industrial engineering, 34 (1998), 391.
doi: 10.1016/S0360-8352(97)00164-2. |
[19] |
S. H. L. Mirhosseyni and P. Web, A hybrid fuzzy knowledge-based expert system and genetic algorithm for efficient selection and assignment of material handling equipment,, Expert Systems with Applications, 36 (2009), 11875.
doi: 10.1016/j.eswa.2009.04.014. |
[20] |
B. Morgan, Optimizing truck-loader matching,, in Mine Planning and Equipment Selection 1994 : Proceedings of the third International Symposium on Mine Planning and Equipment Selection, (1994), 18. Google Scholar |
[21] |
S. Rajagopalan, Capacity expansion and equipment replacement: A unified approach,, Operations Research, 46 (1998), 846.
doi: 10.1287/opre.46.6.846. |
[22] |
D. Raman, S. Nagalingam, B. Gurd and G. Lin, Quantity of material handling equipment - a queuing theory based approach,, Robotics and Computer-Integrated Manufacturing, 25 (2009), 348. Google Scholar |
[23] |
S. Ramazan and R. Dimitrakopoulos, Production scheduling optimisation in a nickel laterite deposit: MIP and LP applications and infeasibility in the presence of orebody variability,, in Twelfth International Symposium on Mine Planning & Equipment Selection MPES 2003 (eds. M. D. Kuruppu and P. A. Lilly), (2003), 3. Google Scholar |
[24] |
S. D. Smith, G. S. Wood and M. Gould, A new earthworks estimating methodology,, Construction Management and Economics, 18 (2000), 219.
doi: 10.1080/014461900370843. |
[25] |
E. Topal and S. Ramazan, A new MIP model for mine equipment scheduling by minimizing maintenance cost,, European Journal of Operational Research, 207 (2010), 1065.
doi: 10.1016/j.ejor.2010.05.037. |
[26] |
D. Webster and R. Reed, A material handling system selection model,, AIIE Transactions, 3 (1971), 13.
doi: 10.1080/05695557108974781. |
[1] |
Ardeshir Ahmadi, Hamed Davari-Ardakani. A multistage stochastic programming framework for cardinality constrained portfolio optimization. Numerical Algebra, Control & Optimization, 2017, 7 (3) : 359-377. doi: 10.3934/naco.2017023 |
[2] |
Luke Finlay, Vladimir Gaitsgory, Ivan Lebedev. Linear programming solutions of periodic optimization problems: approximation of the optimal control. Journal of Industrial & Management Optimization, 2007, 3 (2) : 399-413. doi: 10.3934/jimo.2007.3.399 |
2019 Impact Factor: 1.366
Tools
Metrics
Other articles
by authors
[Back to Top]