
-
Previous Article
Uncertain spring vibration equation
- JIMO Home
- This Issue
-
Next Article
Penalized NCP-functions for nonlinear complementarity problems and a scaling algorithm
Online First articles are published articles within a journal that have not yet been assigned to a formal issue. This means they do not yet have a volume number, issue number, or page numbers assigned to them, however, they can still be found and cited using their DOI (Digital Object Identifier). Online First publication benefits the research community by making new scientific discoveries known as quickly as possible.
Readers can access Online First articles via the “Online First” tab for the selected journal.
Outsourcing contract design for the green transformation of manufacturing systems under asymmetric information
Business School, SiChuan University, Chengdu 610065, China |
Accepting that suppliers' capability for green transformation of manufacturing systems is private information and that the efforts made in the process of transformation invisibly involve private actions of buyers, we construct an outsourcing model including transformation services before project delivery and maintenance services within the warranty period after project delivery and research the optimal outsourcing contract design for buyers. We find that the buyer can design a set of contract menus, including fixed compensation and variable compensation related to the quantity of energy conservation and emission reduction (ECER), to identify suppliers with different transformation capabilities and encourage them to make the best efforts under asymmetric information. Second, to identify the suppliers' transformation capability, the buyer needs to pay information rent to the supplier with high transformation ability. Meanwhile, the existence of asymmetric information will make the supplier with low transformation ability exert insufficient effort, and the existence of asymmetric information will always reduce the buyer's expected utility. In addition, the example analysis shows that asymmetric information always reduces the expected number of ECERs of the buyer. Therefore, it is suggested that the government should consider screening the transformation ability of green technology suppliers, disclose to the market and recommend suppliers with high transformation ability to reduce the negative impact caused by asymmetric information.
References:
[1] |
L. Athias and S. Saussier,
Are public private partnerships that rigid? And why? Evidence from price provisions in French toll road concession contracts, Transportation Research Part A: Policy and Practice, 111 (2018), 174-186.
doi: 10.1016/j.tra.2018.02.011. |
[2] |
S. P. Chuang and C. L. Yang,
Key success factors when implementing a green-manufacturing system, Production Planning and Control, 25 (2014), 923-937.
doi: 10.1080/09537287.2013.780314. |
[3] |
B. Cao and J. Gao,
Quality incentive contract with asymmetric process design quality information, Chinese Journal of Management Science, 26 (2018), 145-153.
|
[4] |
A. M. Deif,
A system model for green manufacturing, Journal of Cleaner Production, 19 (2011), 1553-1559.
doi: 10.1016/j.jclepro.2011.05.022. |
[5] |
A. Goli, E. B. Tirkolaee and N. S. Aydin, Fuzzy integrated cell formation and production scheduling considering automated guided vehicles and human factors, IEEE Transactions on Fuzzy Systems, (2021).
doi: 10.1109/TFUZZ.2021.3053838. |
[6] |
A. Goli and M. Alinaghian,
A new mathematical model for production and delivery scheduling problem with common cycle in a supply chain with open-shop system, International Journal of Manufacturing Technology and Management, 34 (2020), 174-187.
doi: 10.1504/IJMTM.2020.10027948. |
[7] |
K. L. Hui, P. F. Ke, Y. X. Yao and W. T. Yue,
Bilateral liability-based contracts in information security outsourcing, Information Systems Research, 30 (2019), 411-429.
doi: 10.1287/isre.2018.0806. |
[8] |
H. Huang and M. H. Hu, Contract design for IT outsourcing under asymmetric information, Chinese Journal of Management Science, (2020). |
[9] |
H. Huang, L. M. Liu, G. Parker, Y. Tan and H. Y. Xu,
Multi-attribute procurement auctions in the presence of satisfaction risk, Production and Operations Management, 28 (2019), 1206-1221.
doi: 10.1111/poms.12979. |
[10] |
T. Jain, J. Hazra and T. C. E. Cheng, IT outsourcing and vendor cost improvement strategies under asymmetric information, Decision Sciences, (2020).
doi: 10.1111/deci.12446. |
[11] |
K. Li, X. Zhang, Y. T. Leung and S. L. Yang,
Parallel machine scheduling problems in green manufacturing industry, Journal of Manufacturing Systems, 38 (2016), 98-106.
doi: 10.1016/j.jmsy.2015.11.006. |
[12] |
G. Li, M. K. Lim and Z. Wang,
Stakeholders, green manufacturing, and practice performance: Empirical evidence from Chinese fashion businesses, Annals of Operations Research, 290 (2020), 961-982.
doi: 10.1007/s10479-019-03157-7. |
[13] |
H. M. Liu, X. Y. Zhang and M. Y. Hu,
Game-theory-based analysis of Energy Performance Contracting for building retrofits, Journal of Cleaner Production, 231 (2019), 1089-1099.
|
[14] |
C. Liu, W. Chen and J. Mu,
Retailer's multi-tier green procurement contract in the presence of suppliers' reference point effect, Production and Operations Management, 131 (2019), 242-258.
doi: 10.1016/j.cie.2019.03.013. |
[15] |
D. Li and L. B. Zhu, Guidelines for Cleaner Production in Industrial Enterprises, Science Press, Beijing, 2019.
![]() |
[16] |
R. Lotfi, G. W. Weber, S. M. Sajadifar and N. Mardani,
Interdependent demand in the two-period newsvendor problem, Journal of Industrial and Management Optimization, 16 (2016), 117-140.
doi: 10.3934/jimo.2018143. |
[17] |
R. Lotfi, Z. Yadegari, S. H. Hosseini, A. H. Khameneh and G. W. Weber,
A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project, Journal of Industrial and Management Optimization, 13 (2020), 1-22.
|
[18] |
R. Lotfi, Y. Z. Mehrjerdi, M. S. Pishvaee, A. Sadegheih and G. W. Weber,
A robust optimization model for sustainable and resilient closed-loop supply chain network design considering conditional value at risk, Numer. Algebra Control Optim., 11 (2021), 221-253.
doi: 10.3934/naco.2020023. |
[19] |
R. Lotfi, Y. Z. Mehrjerdi and N. Mardani,
A multi-objective and multi-product advertising billboard location model with attraction factor mathematical modeling and solutions, International Journal of Applied Logistics, 7 (2017), 64-87.
doi: 10.4018/IJAL.2017010104. |
[20] |
J. J. Laffont and J. Tirole, A Theory of Incentives in Procurement and Regulation, MIT Press Books, 1993. |
[21] |
V. Martínez-de-Albéniz and D. Simchi-Levi,
A portfolio approach to procurement contracts, Production and Operations Management, 14 (2010), 90-114.
|
[22] |
A. Maccormack and A. Mishra,
Managing the performance trade-offs from partner integration: Implications of contract choice in R & D Projects, Production and Operations Management, 24 (2015), 1552-1569.
doi: 10.1111/poms.12374. |
[23] |
T. Paksoy and E. Ozceylan,
Environmentally conscious optimization of supply chain networks, Journal of the Operational Research Society, 65 (2014), 855-872.
doi: 10.1057/jors.2012.95. |
[24] |
T. Paksoy, N. Y. Pehlivan and E. Ozceylan,
Fuzzy multi-objective optimization of a green supply chain network with risk management that includes environmental hazards, Human and Ecological Risk Assessment, 18 (2012), 1120-1151.
doi: 10.1080/10807039.2012.707940. |
[25] |
Q. Qiu, L. Cui, J. Y. Shen and Y. Li,
Optimal maintenance policy considering maintenance errors for systems operating under performance-based contracts, Computers and Industrial Engineering, 112 (2017), 147-155.
doi: 10.1016/j.cie.2017.08.025. |
[26] |
W. H. Tsai, H. C. Chen, J. Y. Liu, S. P. Chen and Y. S. Shen,
Using activity-based costing to evaluate capital investments for green manufacturing systems, International Journal of Production Research, 49 (2011), 7275-7292.
doi: 10.1080/00207543.2010.537389. |
[27] |
E. B. Tirkolaee and N. S. Aydn, A sustainable medical waste collection and transportation model for pandemics, Waste Management and Research, (2021).
doi: 10.1177/0734242X211000437. |
[28] |
E. B. Tirkolaee, P. Abbasian and G. W. Weber,
Sustainable fuzzy multi-trip location-routing problem for medical waste management during the COVID-19 outbreak, Science of The Total Environment, 10 (2020), 143607.
|
[29] |
C. Wang, G. Schmidt and V. D. R. Bo,
Stage-gate contracts to screen agents with inside information, Decision Sciences, 49 (2018), 1156-1186.
doi: 10.1111/deci.12308. |
show all references
References:
[1] |
L. Athias and S. Saussier,
Are public private partnerships that rigid? And why? Evidence from price provisions in French toll road concession contracts, Transportation Research Part A: Policy and Practice, 111 (2018), 174-186.
doi: 10.1016/j.tra.2018.02.011. |
[2] |
S. P. Chuang and C. L. Yang,
Key success factors when implementing a green-manufacturing system, Production Planning and Control, 25 (2014), 923-937.
doi: 10.1080/09537287.2013.780314. |
[3] |
B. Cao and J. Gao,
Quality incentive contract with asymmetric process design quality information, Chinese Journal of Management Science, 26 (2018), 145-153.
|
[4] |
A. M. Deif,
A system model for green manufacturing, Journal of Cleaner Production, 19 (2011), 1553-1559.
doi: 10.1016/j.jclepro.2011.05.022. |
[5] |
A. Goli, E. B. Tirkolaee and N. S. Aydin, Fuzzy integrated cell formation and production scheduling considering automated guided vehicles and human factors, IEEE Transactions on Fuzzy Systems, (2021).
doi: 10.1109/TFUZZ.2021.3053838. |
[6] |
A. Goli and M. Alinaghian,
A new mathematical model for production and delivery scheduling problem with common cycle in a supply chain with open-shop system, International Journal of Manufacturing Technology and Management, 34 (2020), 174-187.
doi: 10.1504/IJMTM.2020.10027948. |
[7] |
K. L. Hui, P. F. Ke, Y. X. Yao and W. T. Yue,
Bilateral liability-based contracts in information security outsourcing, Information Systems Research, 30 (2019), 411-429.
doi: 10.1287/isre.2018.0806. |
[8] |
H. Huang and M. H. Hu, Contract design for IT outsourcing under asymmetric information, Chinese Journal of Management Science, (2020). |
[9] |
H. Huang, L. M. Liu, G. Parker, Y. Tan and H. Y. Xu,
Multi-attribute procurement auctions in the presence of satisfaction risk, Production and Operations Management, 28 (2019), 1206-1221.
doi: 10.1111/poms.12979. |
[10] |
T. Jain, J. Hazra and T. C. E. Cheng, IT outsourcing and vendor cost improvement strategies under asymmetric information, Decision Sciences, (2020).
doi: 10.1111/deci.12446. |
[11] |
K. Li, X. Zhang, Y. T. Leung and S. L. Yang,
Parallel machine scheduling problems in green manufacturing industry, Journal of Manufacturing Systems, 38 (2016), 98-106.
doi: 10.1016/j.jmsy.2015.11.006. |
[12] |
G. Li, M. K. Lim and Z. Wang,
Stakeholders, green manufacturing, and practice performance: Empirical evidence from Chinese fashion businesses, Annals of Operations Research, 290 (2020), 961-982.
doi: 10.1007/s10479-019-03157-7. |
[13] |
H. M. Liu, X. Y. Zhang and M. Y. Hu,
Game-theory-based analysis of Energy Performance Contracting for building retrofits, Journal of Cleaner Production, 231 (2019), 1089-1099.
|
[14] |
C. Liu, W. Chen and J. Mu,
Retailer's multi-tier green procurement contract in the presence of suppliers' reference point effect, Production and Operations Management, 131 (2019), 242-258.
doi: 10.1016/j.cie.2019.03.013. |
[15] |
D. Li and L. B. Zhu, Guidelines for Cleaner Production in Industrial Enterprises, Science Press, Beijing, 2019.
![]() |
[16] |
R. Lotfi, G. W. Weber, S. M. Sajadifar and N. Mardani,
Interdependent demand in the two-period newsvendor problem, Journal of Industrial and Management Optimization, 16 (2016), 117-140.
doi: 10.3934/jimo.2018143. |
[17] |
R. Lotfi, Z. Yadegari, S. H. Hosseini, A. H. Khameneh and G. W. Weber,
A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: A case study for a bridge construction project, Journal of Industrial and Management Optimization, 13 (2020), 1-22.
|
[18] |
R. Lotfi, Y. Z. Mehrjerdi, M. S. Pishvaee, A. Sadegheih and G. W. Weber,
A robust optimization model for sustainable and resilient closed-loop supply chain network design considering conditional value at risk, Numer. Algebra Control Optim., 11 (2021), 221-253.
doi: 10.3934/naco.2020023. |
[19] |
R. Lotfi, Y. Z. Mehrjerdi and N. Mardani,
A multi-objective and multi-product advertising billboard location model with attraction factor mathematical modeling and solutions, International Journal of Applied Logistics, 7 (2017), 64-87.
doi: 10.4018/IJAL.2017010104. |
[20] |
J. J. Laffont and J. Tirole, A Theory of Incentives in Procurement and Regulation, MIT Press Books, 1993. |
[21] |
V. Martínez-de-Albéniz and D. Simchi-Levi,
A portfolio approach to procurement contracts, Production and Operations Management, 14 (2010), 90-114.
|
[22] |
A. Maccormack and A. Mishra,
Managing the performance trade-offs from partner integration: Implications of contract choice in R & D Projects, Production and Operations Management, 24 (2015), 1552-1569.
doi: 10.1111/poms.12374. |
[23] |
T. Paksoy and E. Ozceylan,
Environmentally conscious optimization of supply chain networks, Journal of the Operational Research Society, 65 (2014), 855-872.
doi: 10.1057/jors.2012.95. |
[24] |
T. Paksoy, N. Y. Pehlivan and E. Ozceylan,
Fuzzy multi-objective optimization of a green supply chain network with risk management that includes environmental hazards, Human and Ecological Risk Assessment, 18 (2012), 1120-1151.
doi: 10.1080/10807039.2012.707940. |
[25] |
Q. Qiu, L. Cui, J. Y. Shen and Y. Li,
Optimal maintenance policy considering maintenance errors for systems operating under performance-based contracts, Computers and Industrial Engineering, 112 (2017), 147-155.
doi: 10.1016/j.cie.2017.08.025. |
[26] |
W. H. Tsai, H. C. Chen, J. Y. Liu, S. P. Chen and Y. S. Shen,
Using activity-based costing to evaluate capital investments for green manufacturing systems, International Journal of Production Research, 49 (2011), 7275-7292.
doi: 10.1080/00207543.2010.537389. |
[27] |
E. B. Tirkolaee and N. S. Aydn, A sustainable medical waste collection and transportation model for pandemics, Waste Management and Research, (2021).
doi: 10.1177/0734242X211000437. |
[28] |
E. B. Tirkolaee, P. Abbasian and G. W. Weber,
Sustainable fuzzy multi-trip location-routing problem for medical waste management during the COVID-19 outbreak, Science of The Total Environment, 10 (2020), 143607.
|
[29] |
C. Wang, G. Schmidt and V. D. R. Bo,
Stage-gate contracts to screen agents with inside information, Decision Sciences, 49 (2018), 1156-1186.
doi: 10.1111/deci.12308. |





Reference | Objective | Solution | Conclusion | ||
Deif [4] | Design and improve green manufacturing systems | A new model | A comprehensive qualitative answer to the question. | ||
Tsai et al. [26] | Assist the justification of capital investments for green manufacturing systems (GMSs) | Activity-based costing | Provide insight into the value of capital investments for a GMS based ABC | ||
Chuang et al. [2] | Evaluate the performance of a green manufacturing system | A new model | The three-layer assessment model is practical | ||
Li et al. [11] | Scheduling problems that arise in green manufacturing companies | Efficient heuristics | Find a schedule that minimizes the total completion time | ||
Li et al. [12] | Enhance environmental awareness and green manufacturing practices | Questionnaire investigation | The importance of corporate stakeholders should be promoted | ||
Lotfi et al. [16,17,18,19] | Considers a closed-loop supply chain by taking into account sustainability, resilience, robustness, and risk aversion. | Two stage mixed-integer linear programming model | The robust counterpart provides a better estimation of related factors. | ||
Goli et al. [5,6] | Design a flexible-responsive manufacturing system with automatic material handling systems. | A fuzzy mixed integer linear programming model | Proposed algorithms have a high performance compared to CPLEX and other two well-known algorithms | ||
Paksoy et al. [23,24] | The optimization of supply chain structures considering both economic and environmental performances | An integer nonlinear programming model | Help decision makers find the optimal solution | ||
Tirkolaee et al. [27,28] | Try to explain and formulate the sustainable medical waste management problem for pandemics | Proposed a biobjective MILP model | Discuss the practical implications of the results | ||
Cao et al. [3] | Solve asymmetry information in outsourcing of production | Contract theory | Design a quality incentive contract | ||
Wang et al. [29] | Solve asymmetry information in outsourcing of R & D | Stage-gate contracts | The stage-gate contract can help offset the information asymmetry | ||
Hui et al. [7] | Solve asymmetry information in outsourcing of managed security services | Bilateral liability-based contracts | Bilateral liability-based contracts can work in the real world | ||
Huang et al. [8] | Contract design problem of IT service outsourcing | Contract theory | The optimal contract is designed to regulate IT suppliers effectively | ||
This research | Contract design problem of green transformation of manufacturing system outsourcing | Outsourcing contract design | Design a set of contract menus to resolve asymmetric information |
Reference | Objective | Solution | Conclusion | ||
Deif [4] | Design and improve green manufacturing systems | A new model | A comprehensive qualitative answer to the question. | ||
Tsai et al. [26] | Assist the justification of capital investments for green manufacturing systems (GMSs) | Activity-based costing | Provide insight into the value of capital investments for a GMS based ABC | ||
Chuang et al. [2] | Evaluate the performance of a green manufacturing system | A new model | The three-layer assessment model is practical | ||
Li et al. [11] | Scheduling problems that arise in green manufacturing companies | Efficient heuristics | Find a schedule that minimizes the total completion time | ||
Li et al. [12] | Enhance environmental awareness and green manufacturing practices | Questionnaire investigation | The importance of corporate stakeholders should be promoted | ||
Lotfi et al. [16,17,18,19] | Considers a closed-loop supply chain by taking into account sustainability, resilience, robustness, and risk aversion. | Two stage mixed-integer linear programming model | The robust counterpart provides a better estimation of related factors. | ||
Goli et al. [5,6] | Design a flexible-responsive manufacturing system with automatic material handling systems. | A fuzzy mixed integer linear programming model | Proposed algorithms have a high performance compared to CPLEX and other two well-known algorithms | ||
Paksoy et al. [23,24] | The optimization of supply chain structures considering both economic and environmental performances | An integer nonlinear programming model | Help decision makers find the optimal solution | ||
Tirkolaee et al. [27,28] | Try to explain and formulate the sustainable medical waste management problem for pandemics | Proposed a biobjective MILP model | Discuss the practical implications of the results | ||
Cao et al. [3] | Solve asymmetry information in outsourcing of production | Contract theory | Design a quality incentive contract | ||
Wang et al. [29] | Solve asymmetry information in outsourcing of R & D | Stage-gate contracts | The stage-gate contract can help offset the information asymmetry | ||
Hui et al. [7] | Solve asymmetry information in outsourcing of managed security services | Bilateral liability-based contracts | Bilateral liability-based contracts can work in the real world | ||
Huang et al. [8] | Contract design problem of IT service outsourcing | Contract theory | The optimal contract is designed to regulate IT suppliers effectively | ||
This research | Contract design problem of green transformation of manufacturing system outsourcing | Outsourcing contract design | Design a set of contract menus to resolve asymmetric information |
Symbols | Definition |
Decision variables | |
Fixed remuneration provided by the employer to the contractor | |
Unit reward of ECER exceeding the benchmark after system transformation | |
Parameters | |
Capability parameters of the contractor's transformation system | |
The types of contractors: high type (with higher transformation capacity |
|
The probability that the contractor is high | |
Contractor's efforts to transform the system | |
Number of ECERs achieved after system transformation | |
The benchmark number of ECERs required by the employer according to relevant government or industry standards | |
Failure number in warranty period after system transformation | |
The maximum number of failures in the warranty period after the completion of system transformation | |
Total cost of the contractor's modification of the system | |
The single maintenance cost | |
Value coefficient of ECER quantity to the employer | |
Sensitivity coefficient of the employer to the number of failures in the warranty period |
Symbols | Definition |
Decision variables | |
Fixed remuneration provided by the employer to the contractor | |
Unit reward of ECER exceeding the benchmark after system transformation | |
Parameters | |
Capability parameters of the contractor's transformation system | |
The types of contractors: high type (with higher transformation capacity |
|
The probability that the contractor is high | |
Contractor's efforts to transform the system | |
Number of ECERs achieved after system transformation | |
The benchmark number of ECERs required by the employer according to relevant government or industry standards | |
Failure number in warranty period after system transformation | |
The maximum number of failures in the warranty period after the completion of system transformation | |
Total cost of the contractor's modification of the system | |
The single maintenance cost | |
Value coefficient of ECER quantity to the employer | |
Sensitivity coefficient of the employer to the number of failures in the warranty period |
Situations | High type | Low type | |
Symmetric information | |||
Asymmetric information | |||
1 Among them, $f_{L1}^{A{\rm{*}}}{\rm{ = }}0$, $f_{L2}^{A{\rm{*}}}{\rm{ = }}\frac{{\left({1 - \rho } \right){\beta _L}\left({u{\rm{ + }}v} \right) - \rho \left({{\beta _H}{\rm{ + }}w{\beta _H} - {\beta _L} - w{\beta _L}} \right)}}{{\left({1 - \rho } \right){\beta _L}{\rm{ + }}\rho {\beta _H} - \rho {\beta _L}}}$, $x = \frac{{\rho {\beta _L}\left({{\beta _H}{\rm{ + }}w{\beta _H} - {\beta _L} - w{\beta _L}} \right)}}{{1 - \rho }}$ |
Situations | High type | Low type | |
Symmetric information | |||
Asymmetric information | |||
1 Among them, $f_{L1}^{A{\rm{*}}}{\rm{ = }}0$, $f_{L2}^{A{\rm{*}}}{\rm{ = }}\frac{{\left({1 - \rho } \right){\beta _L}\left({u{\rm{ + }}v} \right) - \rho \left({{\beta _H}{\rm{ + }}w{\beta _H} - {\beta _L} - w{\beta _L}} \right)}}{{\left({1 - \rho } \right){\beta _L}{\rm{ + }}\rho {\beta _H} - \rho {\beta _L}}}$, $x = \frac{{\rho {\beta _L}\left({{\beta _H}{\rm{ + }}w{\beta _H} - {\beta _L} - w{\beta _L}} \right)}}{{1 - \rho }}$ |
Circumstances | Strategies |
The information of contractor's transformation capability is symmetric | Make the optimal outsourcing contract according to the type of contractor |
The information of contractor's transformation capability is asymmetric | Make a set of optimal outsourcing contract menu for contractors to choose from |
Circumstances | Strategies |
The information of contractor's transformation capability is symmetric | Make the optimal outsourcing contract according to the type of contractor |
The information of contractor's transformation capability is asymmetric | Make a set of optimal outsourcing contract menu for contractors to choose from |
[1] |
Chong Zhang, Yaxian Wang, Haiyan Wang. Design of an environmental contract under trade credits and carbon emission reduction. Journal of Industrial and Management Optimization, 2021 doi: 10.3934/jimo.2021141 |
[2] |
Apostolis Pavlou. Asymmetric information in a bilateral monopoly. Journal of Dynamics and Games, 2016, 3 (2) : 169-189. doi: 10.3934/jdg.2016009 |
[3] |
E. García-Toraño Andrés, Bavo Langerock, Frans Cantrijn. Aspects of reduction and transformation of Lagrangian systems with symmetry. Journal of Geometric Mechanics, 2014, 6 (1) : 1-23. doi: 10.3934/jgm.2014.6.1 |
[4] |
Kegui Chen, Xinyu Wang, Min Huang, Wai-Ki Ching. Salesforce contract design, joint pricing and production planning with asymmetric overconfidence sales agent. Journal of Industrial and Management Optimization, 2017, 13 (2) : 873-899. doi: 10.3934/jimo.2016051 |
[5] |
Shuhua Zhang, Xinyu Wang, Song Wang. Modeling and computation of energy efficiency management with emission permits trading. Journal of Industrial and Management Optimization, 2018, 14 (4) : 1349-1365. doi: 10.3934/jimo.2018010 |
[6] |
Qing-you Yan, Juan-bo Li, Ju-liang Zhang. Licensing schemes in Stackelberg model under asymmetric information of product costs. Journal of Industrial and Management Optimization, 2007, 3 (4) : 763-774. doi: 10.3934/jimo.2007.3.763 |
[7] |
Qingguo Bai, Fanwen Meng. Impact of risk aversion on two-echelon supply chain systems with carbon emission reduction constraints. Journal of Industrial and Management Optimization, 2020, 16 (4) : 1943-1965. doi: 10.3934/jimo.2019037 |
[8] |
Xue-Yan Wu, Zhi-Ping Fan, Bing-Bing Cao. Cost-sharing strategy for carbon emission reduction and sales effort: A nash game with government subsidy. Journal of Industrial and Management Optimization, 2020, 16 (4) : 1999-2027. doi: 10.3934/jimo.2019040 |
[9] |
Qianru li, Weida chen, Yongming zhang. Optimal production and emission reduction policies for a remanufacturing firm considering deferred payment strategy. Journal of Industrial and Management Optimization, 2021, 17 (5) : 2475-2503. doi: 10.3934/jimo.2020078 |
[10] |
Ziyuan Zhang, Liying Yu. Joint emission reduction dynamic optimization and coordination in the supply chain considering fairness concern and reference low-carbon effect. Journal of Industrial and Management Optimization, 2021 doi: 10.3934/jimo.2021155 |
[11] |
Guangzhou Yan, Qinyu Song, Yaodong Ni, Xiangfeng Yang. Pricing, carbon emission reduction and recycling decisions in a closed-loop supply chain under uncertain environment. Journal of Industrial and Management Optimization, 2021 doi: 10.3934/jimo.2021181 |
[12] |
Robert I. McLachlan, G. R. W. Quispel. Discrete gradient methods have an energy conservation law. Discrete and Continuous Dynamical Systems, 2014, 34 (3) : 1099-1104. doi: 10.3934/dcds.2014.34.1099 |
[13] |
Xiaomei Li, Renjing Liu, Zhongquan Hu, Jiamin Dong. Information sharing in two-tier supply chains considering cost reduction effort and information leakage. Journal of Industrial and Management Optimization, 2021 doi: 10.3934/jimo.2021200 |
[14] |
Zhongbao Zhou, Yanfei Bai, Helu Xiao, Xu Chen. A non-zero-sum reinsurance-investment game with delay and asymmetric information. Journal of Industrial and Management Optimization, 2021, 17 (2) : 909-936. doi: 10.3934/jimo.2020004 |
[15] |
Guoqiang Shi, Yong Wang, Dejian Xia, Yanfei Zhao. Information sharing when competing manufacturers adopt asymmetric channel in an e-tailer. Journal of Industrial and Management Optimization, 2021 doi: 10.3934/jimo.2021207 |
[16] |
Xiuting Li. The energy conservation for weak solutions to the relativistic Nordström-Vlasov system. Evolution Equations and Control Theory, 2016, 5 (1) : 135-145. doi: 10.3934/eect.2016.5.135 |
[17] |
Karim El Laithy, Martin Bogdan. Synaptic energy drives the information processing mechanisms in spiking neural networks. Mathematical Biosciences & Engineering, 2014, 11 (2) : 233-256. doi: 10.3934/mbe.2014.11.233 |
[18] |
Xiaoshuang Xing, Gaofei Sun, Yong Jin, Wenyi Tang, Xiuzhen Cheng. Relay selection based on social relationship prediction and information leakage reduction for mobile social networks. Mathematical Foundations of Computing, 2018, 1 (4) : 369-382. doi: 10.3934/mfc.2018018 |
[19] |
Liren Lin, I-Liang Chern. A kinetic energy reduction technique and characterizations of the ground states of spin-1 Bose-Einstein condensates. Discrete and Continuous Dynamical Systems - B, 2014, 19 (4) : 1119-1128. doi: 10.3934/dcdsb.2014.19.1119 |
[20] |
Chandan Pathak, Saswati Mukherjee, Santanu Kumar Ghosh, Sudhansu Khanra. A three echelon supply chain model with stochastic demand dependent on price, quality and energy reduction. Journal of Industrial and Management Optimization, 2021 doi: 10.3934/jimo.2021098 |
2020 Impact Factor: 1.801
Tools
Article outline
Figures and Tables
[Back to Top]