
-
Previous Article
Existence and iterative approximation method for solving mixed equilibrium problem under generalized monotonicity in Banach spaces
- NACO Home
- This Issue
-
Next Article
Initial guess sensitivity in computational optimal control problems
Imperfection with inspection policy and variable demand under trade-credit: A deteriorating inventory model
1. | Department of Applied Mathematics with Oceanology and Computer Programming, Vidyasagar University, Midnapore-721102, West Bengal, India |
2. | Faculty of Engineering Management, Chair of Marketing and Economic Engineering, Poznan University of Technology, ul. Strzelecka 11, 60-965 Poznan, Poland |
A deteriorating inventory model with imperfect product and variable demand is formulated in this paper. A time-dependent deterioration factor is considered because the rate of deterioration is highly hinging on time. We introduce imperfect quality of production which leads to imperfect items in our proposed model. The retailer adopts inspection policy to pick over the perfect items from imperfect. Type Ⅰ and Type Ⅱ, both type of errors are included and the retailer invest some capital to improve the production process quality of the supplier. There is also a penalty cost for the retailer if they deliver some defective items by mistake. Sometime, there is a high amount of demand and, consequently, we assume shortages and partial backorder in our formulated model. The retailer adopts the trade-credit policy for his customers in order to promote market competition. The main objective of the paper is to show that the total cost is globally minimized and we have aimed at reducing the total cycle length, defectiveness of the system and the optimal order size by maximizing the total profit of the system. Then, we present three theorems and prove them to find an easy solution procedure to reduce the total cost of a system. The results are discussed with the help of numerical examples to approve the proposed model. A sensitivity analysis of the optimal solutions for the parameters is also provided. The paper ends with the conclusions and an outlook to possible future studies.
References:
[1] |
S. P. Aggarwal and C. K. Jaggi,
Ordering policies of deteriorating items under permissible delay in payments, The Journal of the Operational Research Society, 46 (1995), 658-662.
|
[2] |
M. Bakker, J. Riezebos and R. H. Teunter.,
Review of inventory systems with deterioration since 2001, European Journal of Operational Research, 221 (2012), 275-284.
doi: 10.1016/j.ejor.2012.03.004. |
[3] |
Z. T. Balkhi,
An optimal solution of a general lot size inventory model with deteriorated and imperfect products, taking into account inflation and time value of money, International Journal of Systems Science, 35 (2004), 87-96.
doi: 10.1016/S0377-2217(00)00133-8. |
[4] |
L. E. Cárdenas-Barrón,
Economic production quantity with rework process at a single-stage manufacturing system with planned backorders, Computers and Industrial Engineering, 57 (2009), 1105-1113.
|
[5] |
H. J. Chang and C. Y. Dye,
An inventory model for deteriorating items with partial back logging and permissible delay in payments, International Journal of Systems Science, 32 (2001), 345-352.
doi: 10.1080/002077201300029700. |
[6] |
K. Chung and P. Ting,
An heuristic for replenishment of deteriorating items with a linear trend in demand, Journal of the Operational Research Society, 44 (1993), 1235-1241.
|
[7] |
U. Dave and L. K. Patel,
$(T, S_j)$ policy inventory model for deteriorating items with time proportional demand, Journal of the Operational Research Society, 32 (1981), 137-142.
doi: 10.1016/0377-2217(80)90190-3. |
[8] |
W. A. Donaldson,
Inventory replenishment policy for a linear trend in demand-an analytical solution, Operational Research Quaterly, 28 (1977), 663-670.
|
[9] |
C. Y. Dye,
The effect of preservation technology investment on a non-instantaneous deteriorating inventory model, Omega, 41 (2013), 872-880.
|
[10] |
P. M. Ghare and G. P. Schrader,
A model for an exponentially decaying inventory, Journal of Industrial Engineering, 14 (1963), 238-243.
|
[11] |
S. K. Ghosh and K. S. Chaudhuri,
An order-level inventory model for a deteriorating item with Weibull distribution deterioration, time-quadratic demand and shortages, Advanced Modelling and Optimization, 6 (2004), 21-35.
|
[12] |
A. Goswami and K. S. Chaudhuri,
An EOQ model for deteriorating items with shortages and a linear trend in demand, The Journal of the Operational Research Society, 42 (1991), 1105-1110.
|
[13] |
S. K. Goyal,
Economic order quantity under conditions of permissible delay in payments, The Journal of Operational Research Society, 36 (1985), 335-338.
|
[14] |
S. K. Goyal and B. C. Giri,
Recents trends in modelling of deteriorating inventory, European Journal of Operational Research, 134 (2001), 1-16.
doi: 10.1016/S0377-2217(00)00248-4. |
[15] |
R. W. Hall, Zero Inventories, Illinois: Dow Jones-Irwin, Homewood. |
[16] |
M. A. Hargia and L. Benkherouf,
Optimal and heuristic inventory replenishment models for deteriorating items with exponential time-varying demand, European Journal of Operational Research, 79 (1994), 123-137.
|
[17] |
A. K. Jalan, R. R. Giri and K. S. Chaudhuri,
EOQ model for items with Weibull distribution deterioration, shortages and trended demand, International Journal of Systems Science, 27 (1996), 851-855.
|
[18] |
M. Khan, M. Y. Jaber and A. R. Ahmad,
An integrated supply chain model with errors in quality inspection and learning in production, Omega, 42 (2014), 16-24.
|
[19] |
H. L. Lee and M. J. Rosenblatt,
Simultaneous determination of production cycles and inspection schedules in a production system, Management Science, 33 (1987), 1125-1136.
|
[20] |
J. J. Liao,
An EOQ model with non instantaneous receipt and exponentially deteriorating items under two-level trade credit, International Journal of Production Economics, 113 (2008), 852-861.
|
[21] |
T. Y. Lin and K. L. Hou,
An imperfect quality economic order quantity with advanced receiving, TOP, 23 (2015), 535-551.
doi: 10.1007/s11750-014-0352-x. |
[22] |
U. Mishra, L. E. Cárdenas-Barrón, S. Tiwari, A. A. Shaikh and G. Treviño-Garza,
An inventory model under price and stock dependent demand for controllable deterioration rate with shortages and preservation technology investment, Annals of Operations Research, 9 (2015), 351-365.
doi: 10.1007/s10479-017-2419-1. |
[23] |
L. Y. Ouyang, J. T. Teng and L. H. Chen,
Optimum ordering policy for deteriorating items with partial backlogging under permissible delay in payments, Journal of Global Optimization, 34 (2005), 245-271.
doi: 10.1007/s10898-005-2604-7. |
[24] |
L. Y. Ouyang, L. Y. Chen and C. T. Yang,
Impacts of collaborative investment and inspection policies on the integrated inventory model with defective items, International Journal of Production Research, 51 (2013), 5789-5802.
|
[25] |
G. Padmanabhan and P. Vrat,
EOQ models for perishable items under stock dependent selling rate, European Journal of Operational Research, 86 (1995), 281-292.
|
[26] |
M. Pervin, G. C. Mahata and S. K. Roy,
An inventory model with demand declining market for deteriorating items under trade credit policy, International Journal of Management Science and Engineering Management, 11 (2016), 243-251.
|
[27] |
M. Pervin, S. K. Roy and G. W. Weber,
Analysis of inventory control model with shortage under time-dependent demand and time-varying holding cost including stochastic deterioration, Annals of Operations Research, 260 (2018), 437-460.
doi: 10.1007/s10479-016-2355-5. |
[28] |
M. Pervin, S. K. Roy and G. W. Weber,
A Two-echelon inventory model with stock-dependent demand and variable holding cost for deteriorating items, Numerical Algebra, Control and Optimization, 7 (2017), 21-50.
doi: 10.3934/naco.2017002. |
[29] |
M. Pervin, S. K. Roy and G. W. Weber,
An integrated inventory model with variable holding cost under two levels of trade-credit policy, Numerical Algebra, Control and Optimization, 8 (2018), 169-191.
doi: 10.3934/naco.2018010. |
[30] |
M. Pervin, S. K. Roy and G. W. Weber,
Multi-item deteriorating two-echelon inventory model with price- and stock-dependent demand: A trade-credit policy, Journal of Industrial and Management Optimization, 15 (2019), 1345-1373.
doi: 10.3934/jimo.2018098. |
[31] |
M. Pervin, S. K. Roy and G. W. Weber, Deteriorating inventory with preservation technology under price- and stock-sensitive demand, Journal of Industrial and Management Optimization, DOI: 10.3934/jimo.2019019.
doi: 10.3934/jimo.2019019. |
[32] |
E. L. Porteus,
Optimal lot sizing, process quality improvement and setup cost reduction, Operations Research, 34 (1986), 137-144.
|
[33] |
S. K. Roy, M. Pervin and G. W. Weber, A two-warehouse probabilistic model with price discount on backorders under two levels of trade-credit policy, Journal of Industrial and Management Optimization, DOI: 10.3934/jimo.2018167.
doi: 10.3934/jimo.2018167. |
[34] |
M. K. Salameh and M. Y. Jaber,
Economic production quantity model for items with imperfect quality, International Journal of Production Economics, 64 (2000), 59-64.
|
[35] |
S. S. Sana,
An economic production lot size model in an imperfect production system, European Journal of Operational Research, 201 (2010), 158-170.
doi: 10.1504/IJMOR.2010.033441. |
[36] |
S. S. Sana, S. K. Goyal and K. S. Chaudhuri,
A production inventory model for a deteriorating item with trended demand and shortages, European Journal of Operational Research, 157 (2004), 357-371.
doi: 10.1016/S0377-2217(03)00222-4. |
[37] |
B. Sarkar, S. Saren and L. E. Cárdenas-Barrón,
An inventory model with trade-credit policy and variable deterioration for fixed lifetime products, Annals of Operations Research, 229 (2015), 677-702.
doi: 10.1007/s10479-014-1745-9. |
[38] |
J. T. Teng, H. J. Chang, C. Y. Dye and C. H. Hung,
An optimal replenishment policy for deterioratng items with time-varying demand and partial backlogging, Operations Research Letters, 30 (2002), 387-393.
doi: 10.1016/S0167-6377(02)00150-5. |
[39] |
R. P. Tripathi,
Inventory model with stock-level dependent demand rate and shortages under trade credits, International Journal of Modern Mathematical Sciences, 13 (2015), 122-136.
|
[40] |
H. M. Wee,
A deterministic lot-size inventory model for deteriorating items with shortages and a declining market, Computers and Operations Research, 22 (1995), 345-356.
|
show all references
References:
[1] |
S. P. Aggarwal and C. K. Jaggi,
Ordering policies of deteriorating items under permissible delay in payments, The Journal of the Operational Research Society, 46 (1995), 658-662.
|
[2] |
M. Bakker, J. Riezebos and R. H. Teunter.,
Review of inventory systems with deterioration since 2001, European Journal of Operational Research, 221 (2012), 275-284.
doi: 10.1016/j.ejor.2012.03.004. |
[3] |
Z. T. Balkhi,
An optimal solution of a general lot size inventory model with deteriorated and imperfect products, taking into account inflation and time value of money, International Journal of Systems Science, 35 (2004), 87-96.
doi: 10.1016/S0377-2217(00)00133-8. |
[4] |
L. E. Cárdenas-Barrón,
Economic production quantity with rework process at a single-stage manufacturing system with planned backorders, Computers and Industrial Engineering, 57 (2009), 1105-1113.
|
[5] |
H. J. Chang and C. Y. Dye,
An inventory model for deteriorating items with partial back logging and permissible delay in payments, International Journal of Systems Science, 32 (2001), 345-352.
doi: 10.1080/002077201300029700. |
[6] |
K. Chung and P. Ting,
An heuristic for replenishment of deteriorating items with a linear trend in demand, Journal of the Operational Research Society, 44 (1993), 1235-1241.
|
[7] |
U. Dave and L. K. Patel,
$(T, S_j)$ policy inventory model for deteriorating items with time proportional demand, Journal of the Operational Research Society, 32 (1981), 137-142.
doi: 10.1016/0377-2217(80)90190-3. |
[8] |
W. A. Donaldson,
Inventory replenishment policy for a linear trend in demand-an analytical solution, Operational Research Quaterly, 28 (1977), 663-670.
|
[9] |
C. Y. Dye,
The effect of preservation technology investment on a non-instantaneous deteriorating inventory model, Omega, 41 (2013), 872-880.
|
[10] |
P. M. Ghare and G. P. Schrader,
A model for an exponentially decaying inventory, Journal of Industrial Engineering, 14 (1963), 238-243.
|
[11] |
S. K. Ghosh and K. S. Chaudhuri,
An order-level inventory model for a deteriorating item with Weibull distribution deterioration, time-quadratic demand and shortages, Advanced Modelling and Optimization, 6 (2004), 21-35.
|
[12] |
A. Goswami and K. S. Chaudhuri,
An EOQ model for deteriorating items with shortages and a linear trend in demand, The Journal of the Operational Research Society, 42 (1991), 1105-1110.
|
[13] |
S. K. Goyal,
Economic order quantity under conditions of permissible delay in payments, The Journal of Operational Research Society, 36 (1985), 335-338.
|
[14] |
S. K. Goyal and B. C. Giri,
Recents trends in modelling of deteriorating inventory, European Journal of Operational Research, 134 (2001), 1-16.
doi: 10.1016/S0377-2217(00)00248-4. |
[15] |
R. W. Hall, Zero Inventories, Illinois: Dow Jones-Irwin, Homewood. |
[16] |
M. A. Hargia and L. Benkherouf,
Optimal and heuristic inventory replenishment models for deteriorating items with exponential time-varying demand, European Journal of Operational Research, 79 (1994), 123-137.
|
[17] |
A. K. Jalan, R. R. Giri and K. S. Chaudhuri,
EOQ model for items with Weibull distribution deterioration, shortages and trended demand, International Journal of Systems Science, 27 (1996), 851-855.
|
[18] |
M. Khan, M. Y. Jaber and A. R. Ahmad,
An integrated supply chain model with errors in quality inspection and learning in production, Omega, 42 (2014), 16-24.
|
[19] |
H. L. Lee and M. J. Rosenblatt,
Simultaneous determination of production cycles and inspection schedules in a production system, Management Science, 33 (1987), 1125-1136.
|
[20] |
J. J. Liao,
An EOQ model with non instantaneous receipt and exponentially deteriorating items under two-level trade credit, International Journal of Production Economics, 113 (2008), 852-861.
|
[21] |
T. Y. Lin and K. L. Hou,
An imperfect quality economic order quantity with advanced receiving, TOP, 23 (2015), 535-551.
doi: 10.1007/s11750-014-0352-x. |
[22] |
U. Mishra, L. E. Cárdenas-Barrón, S. Tiwari, A. A. Shaikh and G. Treviño-Garza,
An inventory model under price and stock dependent demand for controllable deterioration rate with shortages and preservation technology investment, Annals of Operations Research, 9 (2015), 351-365.
doi: 10.1007/s10479-017-2419-1. |
[23] |
L. Y. Ouyang, J. T. Teng and L. H. Chen,
Optimum ordering policy for deteriorating items with partial backlogging under permissible delay in payments, Journal of Global Optimization, 34 (2005), 245-271.
doi: 10.1007/s10898-005-2604-7. |
[24] |
L. Y. Ouyang, L. Y. Chen and C. T. Yang,
Impacts of collaborative investment and inspection policies on the integrated inventory model with defective items, International Journal of Production Research, 51 (2013), 5789-5802.
|
[25] |
G. Padmanabhan and P. Vrat,
EOQ models for perishable items under stock dependent selling rate, European Journal of Operational Research, 86 (1995), 281-292.
|
[26] |
M. Pervin, G. C. Mahata and S. K. Roy,
An inventory model with demand declining market for deteriorating items under trade credit policy, International Journal of Management Science and Engineering Management, 11 (2016), 243-251.
|
[27] |
M. Pervin, S. K. Roy and G. W. Weber,
Analysis of inventory control model with shortage under time-dependent demand and time-varying holding cost including stochastic deterioration, Annals of Operations Research, 260 (2018), 437-460.
doi: 10.1007/s10479-016-2355-5. |
[28] |
M. Pervin, S. K. Roy and G. W. Weber,
A Two-echelon inventory model with stock-dependent demand and variable holding cost for deteriorating items, Numerical Algebra, Control and Optimization, 7 (2017), 21-50.
doi: 10.3934/naco.2017002. |
[29] |
M. Pervin, S. K. Roy and G. W. Weber,
An integrated inventory model with variable holding cost under two levels of trade-credit policy, Numerical Algebra, Control and Optimization, 8 (2018), 169-191.
doi: 10.3934/naco.2018010. |
[30] |
M. Pervin, S. K. Roy and G. W. Weber,
Multi-item deteriorating two-echelon inventory model with price- and stock-dependent demand: A trade-credit policy, Journal of Industrial and Management Optimization, 15 (2019), 1345-1373.
doi: 10.3934/jimo.2018098. |
[31] |
M. Pervin, S. K. Roy and G. W. Weber, Deteriorating inventory with preservation technology under price- and stock-sensitive demand, Journal of Industrial and Management Optimization, DOI: 10.3934/jimo.2019019.
doi: 10.3934/jimo.2019019. |
[32] |
E. L. Porteus,
Optimal lot sizing, process quality improvement and setup cost reduction, Operations Research, 34 (1986), 137-144.
|
[33] |
S. K. Roy, M. Pervin and G. W. Weber, A two-warehouse probabilistic model with price discount on backorders under two levels of trade-credit policy, Journal of Industrial and Management Optimization, DOI: 10.3934/jimo.2018167.
doi: 10.3934/jimo.2018167. |
[34] |
M. K. Salameh and M. Y. Jaber,
Economic production quantity model for items with imperfect quality, International Journal of Production Economics, 64 (2000), 59-64.
|
[35] |
S. S. Sana,
An economic production lot size model in an imperfect production system, European Journal of Operational Research, 201 (2010), 158-170.
doi: 10.1504/IJMOR.2010.033441. |
[36] |
S. S. Sana, S. K. Goyal and K. S. Chaudhuri,
A production inventory model for a deteriorating item with trended demand and shortages, European Journal of Operational Research, 157 (2004), 357-371.
doi: 10.1016/S0377-2217(03)00222-4. |
[37] |
B. Sarkar, S. Saren and L. E. Cárdenas-Barrón,
An inventory model with trade-credit policy and variable deterioration for fixed lifetime products, Annals of Operations Research, 229 (2015), 677-702.
doi: 10.1007/s10479-014-1745-9. |
[38] |
J. T. Teng, H. J. Chang, C. Y. Dye and C. H. Hung,
An optimal replenishment policy for deterioratng items with time-varying demand and partial backlogging, Operations Research Letters, 30 (2002), 387-393.
doi: 10.1016/S0167-6377(02)00150-5. |
[39] |
R. P. Tripathi,
Inventory model with stock-level dependent demand rate and shortages under trade credits, International Journal of Modern Mathematical Sciences, 13 (2015), 122-136.
|
[40] |
H. M. Wee,
A deterministic lot-size inventory model for deteriorating items with shortages and a declining market, Computers and Operations Research, 22 (1995), 345-356.
|




Author(s) | Imperfec tness | Variable demand | Deterio rations | Trade-credit policy | Short ages |
Sana et al. (2004) | |||||
Khan et al. (2014) | |||||
Lin and Hou (2015) | |||||
Teng et al. (2002) | |||||
Ghosh and Chaudhuri (2004) | |||||
Kumar et al. (2012) | |||||
Pervin et al. (2016, a) | |||||
Mahata (2012) | |||||
Goswami and Chaudhuri (1991) | |||||
Aggarwal and Jaggi (1995) | |||||
Ting (2015) | |||||
Ouyang et al. (2005) | |||||
Tripathi (2015) | |||||
Annadurai and Uthayakumar (2015) | |||||
Balkhi (2004) | |||||
Pervin et al. (2016, b) | |||||
Our paper |
Author(s) | Imperfec tness | Variable demand | Deterio rations | Trade-credit policy | Short ages |
Sana et al. (2004) | |||||
Khan et al. (2014) | |||||
Lin and Hou (2015) | |||||
Teng et al. (2002) | |||||
Ghosh and Chaudhuri (2004) | |||||
Kumar et al. (2012) | |||||
Pervin et al. (2016, a) | |||||
Mahata (2012) | |||||
Goswami and Chaudhuri (1991) | |||||
Aggarwal and Jaggi (1995) | |||||
Ting (2015) | |||||
Ouyang et al. (2005) | |||||
Tripathi (2015) | |||||
Annadurai and Uthayakumar (2015) | |||||
Balkhi (2004) | |||||
Pervin et al. (2016, b) | |||||
Our paper |
0.1077 | 1.235 | 1.302 | 1.187 | 3478.12 | 3599.45 | 3517.30 | |
0.1125 | 1.301 | 1.213 | 1.171 | 3560.82 | 3011.67 | 3069.57 | |
0.1092 | 1.420 | 1.387 | 1.432 | 3673.19 | 3095.07 | 3112.70 | |
0.1089 | 1.324 | 1.112 | 1.108 | 3488.22 | 2973.16 | 2844.93 | |
0.1107 | 1.403 | 1.274 | 1.392 | 3579.08 | 3077.45 | 3205.71 | |
0.1073 | 1.449 | 1.171 | 1.321 | 3678.99 | 3360.21 | 3119.54 | |
0.128 | 1.610 | 1.534 | 1.558 | 3879.04 | 3232.70 | 3374.56 | |
0.116 | 1.791 | 1.645 | 1.325 | 3927.34 | 3306.18 | 3317.84 | |
0.125 | 1.570 | 1.349 | 1.102 | 4012.57 | 3812.05 | 3518.38 | |
0.144 | 1.397 | 1.747 | 1.560 | 3939.55 | 3670.10 | 3575.68 |
0.1077 | 1.235 | 1.302 | 1.187 | 3478.12 | 3599.45 | 3517.30 | |
0.1125 | 1.301 | 1.213 | 1.171 | 3560.82 | 3011.67 | 3069.57 | |
0.1092 | 1.420 | 1.387 | 1.432 | 3673.19 | 3095.07 | 3112.70 | |
0.1089 | 1.324 | 1.112 | 1.108 | 3488.22 | 2973.16 | 2844.93 | |
0.1107 | 1.403 | 1.274 | 1.392 | 3579.08 | 3077.45 | 3205.71 | |
0.1073 | 1.449 | 1.171 | 1.321 | 3678.99 | 3360.21 | 3119.54 | |
0.128 | 1.610 | 1.534 | 1.558 | 3879.04 | 3232.70 | 3374.56 | |
0.116 | 1.791 | 1.645 | 1.325 | 3927.34 | 3306.18 | 3317.84 | |
0.125 | 1.570 | 1.349 | 1.102 | 4012.57 | 3812.05 | 3518.38 | |
0.144 | 1.397 | 1.747 | 1.560 | 3939.55 | 3670.10 | 3575.68 |
Para meter | value | Total Cost | Profit | |||||||
+50 | 1350 | 1.832 | 1.572 | 1.624 | 3122.05 | 2705.91 | 2812.83 | |||
+30 | 1170 | 1.510 | 1.480 | 1.613 | 2988.71 | 2633.61 | 2694.74 | |||
+10 | 990 | 1.257 | 1.437 | 1.589 | 2734.00 | 2482.09 | 2503.15 | |||
-10 | 810 | 0.941 | 1.428 | 1.541 | 2613.47 | 2290.41 | 2387.40 | |||
-30 | 630 | 0.703 | 1.410 | 1.516 | 2497.38 | 2100.16 | 2206.85 | |||
-50 | 450 | 0.627 | 1.377 | 1.487 | 2206.16 | 2000.00 | 2183.57 | |||
+50 | 600 | 0.904 | 0.867 | 0.880 | 3385.10 | 2834.61 | 2791.38 | |||
+30 | 520 | 0.760 | 0.843 | 0.861 | 3174.51 | 2690.42 | 2614.50 | |||
+10 | 440 | 0.601 | 0.829 | 0.847 | 2893.67 | 2517.83 | 2576.31 | |||
-10 | 360 | 0.472 | 0.820 | 0.831 | 2635.85 | 2385.76 | 2344.10 | |||
-30 | 280 | 0.275 | 0.816 | 0.822 | 2483.77 | 2189.02 | 2208.47 | |||
-50 | 200 | 0.064 | 0.803 | 0.815 | 2305.38 | 1985.47 | 2083.17 | |||
+50 | 150 | 1.966 | 1.973 | 1.989 | 3192.70 | 2911.56 | 2810.55 | |||
+30 | 130 | 1.728 | 1.854 | 1.910 | 2948.16 | 2738.64 | 2655.18 | |||
+10 | 110 | 1.601 | 1.779 | 1.878 | 2749.03 | 2500.53 | 2451.38 | |||
-10 | 90 | 1.486 | 1.611 | 1.763 | 2605.74 | 2374.95 | 2180.76 | |||
-30 | 70 | 1.310 | 1.572 | 1.683 | 2477.19 | 2285.31 | 2090.59 | |||
-50 | 50 | 1.173 | 1.489 | 1.557 | 2204.60 | 2069.73 | 1877.92 | |||
+50 | 300 | 2.765 | 2.581 | 2.593 | 3592.00 | 2746.31 | 2522.20 | |||
+30 | 260 | 2.303 | 2.505 | 2.512 | 3386.17 | 2506.57 | 2257.46 | |||
+10 | 220 | 2.007 | 2.488 | 2.502 | 3152.04 | 2344.10 | 2037.18 | |||
-10 | 180 | 1.841 | 2.394 | 2.581 | 2819.11 | 2183.51 | 1734.62 | |||
-30 | 140 | 1.573 | 2.353 | 2.473 | 2540.83 | 1982.86 | 1504.27 | |||
-50 | 100 | 1.250 | 2.279 | 2.371 | 2274.62 | 1710.27 | 1374.02 | |||
+50 | 22.5 | 2.791 | 2.880 | 2.898 | 2916.47 | 3721.40 | 2883.45 | |||
+30 | 19.5 | 2.675 | 2.741 | 2.805 | 2803.15 | 3569.00 | 2761.74 | |||
+10 | 16.5 | 2.533 | 2.689 | 2.775 | 2785.32 | 3477.54 | 2653.14 | |||
-10 | 13.5 | 2.412 | 2.537 | 2.643 | 2511.63 | 3307.11 | 2578.39 | |||
-30 | 10.5 | 2.370 | 2.481 | 2.550 | 2479.59 | 3258.46 | 2386.55 | |||
-50 | 7.5 | 2.264 | 2.372 | 2.445 | 2333.16 | 3117.35 | 2290.28 | |||
+50 | 30 | 2.672 | 2.503 | 2.475 | 3599.89 | 2800.00 | 2795.64 | |||
+30 | 26 | 2.538 | 2.484 | 2.449 | 3512.04 | 2715.35 | 2683.05 | |||
+10 | 22 | 2.460 | 2.336 | 2.429 | 3475.68 | 2610.97 | 2500.34 | |||
-10 | 18 | 2.397 | 2.260 | 2.405 | 3381.62 | 2573.61 | 2435.65 | |||
-30 | 14 | 2.200 | 2.175 | 2.391 | 3260.91 | 2483.29 | 2362.41 | |||
-50 | 10 | 2.822 | 2.124 | 2.364 | 3129.56 | 2321.79 | 2155.20 | |||
+50 | 0.60 | 1.754 | 2.134 | 2.431 | 3529.87 | 3138.56 | 2490.18 | |||
+30 | 0.52 | 1.694 | 2.089 | 2.379 | 3348.72 | 2763.79 | 2317.93 | |||
+10 | 0.44 | 1.504 | 1.905 | 2.248 | 3095.23 | 2480.58 | 2188.37 | |||
-10 | 0.36 | 1.438 | 1.881 | 2.179 | 2860.93 | 2201.49 | 2020.99 | |||
-30 | 0.28 | 1.215 | 1.753 | 2.098 | 2547.65 | 1973.10 | 1845.73 | |||
-50 | 0.20 | 1.093 | 1.668 | 1.979 | 2196.37 | 1748.53 | 1549.27 | |||
+50 | 75 | 2.402 | 1.402 | 1.657 | 3891.57 | 3124.51 | 3054.36 | |||
+30 | 65 | 2.763 | 1.435 | 1.661 | 3522.56 | 2910.28 | 2839.17 | |||
+10 | 55 | 2.911 | 1.492 | 1.704 | 3205.84 | 2764.33 | 2780.10 | |||
-10 | 45 | 3.250 | 1.555 | 1.783 | 2935.27 | 2459.37 | 2638.61 | |||
-30 | 35 | 3.619 | 1.784 | 2.044 | 2789.42 | 2218.06 | 2529.50 | |||
-50 | 25 | 3.873 | 1.976 | 2.423 | 2642.17 | 2049.62 | 2485.73 |
Para meter | value | Total Cost | Profit | |||||||
+50 | 1350 | 1.832 | 1.572 | 1.624 | 3122.05 | 2705.91 | 2812.83 | |||
+30 | 1170 | 1.510 | 1.480 | 1.613 | 2988.71 | 2633.61 | 2694.74 | |||
+10 | 990 | 1.257 | 1.437 | 1.589 | 2734.00 | 2482.09 | 2503.15 | |||
-10 | 810 | 0.941 | 1.428 | 1.541 | 2613.47 | 2290.41 | 2387.40 | |||
-30 | 630 | 0.703 | 1.410 | 1.516 | 2497.38 | 2100.16 | 2206.85 | |||
-50 | 450 | 0.627 | 1.377 | 1.487 | 2206.16 | 2000.00 | 2183.57 | |||
+50 | 600 | 0.904 | 0.867 | 0.880 | 3385.10 | 2834.61 | 2791.38 | |||
+30 | 520 | 0.760 | 0.843 | 0.861 | 3174.51 | 2690.42 | 2614.50 | |||
+10 | 440 | 0.601 | 0.829 | 0.847 | 2893.67 | 2517.83 | 2576.31 | |||
-10 | 360 | 0.472 | 0.820 | 0.831 | 2635.85 | 2385.76 | 2344.10 | |||
-30 | 280 | 0.275 | 0.816 | 0.822 | 2483.77 | 2189.02 | 2208.47 | |||
-50 | 200 | 0.064 | 0.803 | 0.815 | 2305.38 | 1985.47 | 2083.17 | |||
+50 | 150 | 1.966 | 1.973 | 1.989 | 3192.70 | 2911.56 | 2810.55 | |||
+30 | 130 | 1.728 | 1.854 | 1.910 | 2948.16 | 2738.64 | 2655.18 | |||
+10 | 110 | 1.601 | 1.779 | 1.878 | 2749.03 | 2500.53 | 2451.38 | |||
-10 | 90 | 1.486 | 1.611 | 1.763 | 2605.74 | 2374.95 | 2180.76 | |||
-30 | 70 | 1.310 | 1.572 | 1.683 | 2477.19 | 2285.31 | 2090.59 | |||
-50 | 50 | 1.173 | 1.489 | 1.557 | 2204.60 | 2069.73 | 1877.92 | |||
+50 | 300 | 2.765 | 2.581 | 2.593 | 3592.00 | 2746.31 | 2522.20 | |||
+30 | 260 | 2.303 | 2.505 | 2.512 | 3386.17 | 2506.57 | 2257.46 | |||
+10 | 220 | 2.007 | 2.488 | 2.502 | 3152.04 | 2344.10 | 2037.18 | |||
-10 | 180 | 1.841 | 2.394 | 2.581 | 2819.11 | 2183.51 | 1734.62 | |||
-30 | 140 | 1.573 | 2.353 | 2.473 | 2540.83 | 1982.86 | 1504.27 | |||
-50 | 100 | 1.250 | 2.279 | 2.371 | 2274.62 | 1710.27 | 1374.02 | |||
+50 | 22.5 | 2.791 | 2.880 | 2.898 | 2916.47 | 3721.40 | 2883.45 | |||
+30 | 19.5 | 2.675 | 2.741 | 2.805 | 2803.15 | 3569.00 | 2761.74 | |||
+10 | 16.5 | 2.533 | 2.689 | 2.775 | 2785.32 | 3477.54 | 2653.14 | |||
-10 | 13.5 | 2.412 | 2.537 | 2.643 | 2511.63 | 3307.11 | 2578.39 | |||
-30 | 10.5 | 2.370 | 2.481 | 2.550 | 2479.59 | 3258.46 | 2386.55 | |||
-50 | 7.5 | 2.264 | 2.372 | 2.445 | 2333.16 | 3117.35 | 2290.28 | |||
+50 | 30 | 2.672 | 2.503 | 2.475 | 3599.89 | 2800.00 | 2795.64 | |||
+30 | 26 | 2.538 | 2.484 | 2.449 | 3512.04 | 2715.35 | 2683.05 | |||
+10 | 22 | 2.460 | 2.336 | 2.429 | 3475.68 | 2610.97 | 2500.34 | |||
-10 | 18 | 2.397 | 2.260 | 2.405 | 3381.62 | 2573.61 | 2435.65 | |||
-30 | 14 | 2.200 | 2.175 | 2.391 | 3260.91 | 2483.29 | 2362.41 | |||
-50 | 10 | 2.822 | 2.124 | 2.364 | 3129.56 | 2321.79 | 2155.20 | |||
+50 | 0.60 | 1.754 | 2.134 | 2.431 | 3529.87 | 3138.56 | 2490.18 | |||
+30 | 0.52 | 1.694 | 2.089 | 2.379 | 3348.72 | 2763.79 | 2317.93 | |||
+10 | 0.44 | 1.504 | 1.905 | 2.248 | 3095.23 | 2480.58 | 2188.37 | |||
-10 | 0.36 | 1.438 | 1.881 | 2.179 | 2860.93 | 2201.49 | 2020.99 | |||
-30 | 0.28 | 1.215 | 1.753 | 2.098 | 2547.65 | 1973.10 | 1845.73 | |||
-50 | 0.20 | 1.093 | 1.668 | 1.979 | 2196.37 | 1748.53 | 1549.27 | |||
+50 | 75 | 2.402 | 1.402 | 1.657 | 3891.57 | 3124.51 | 3054.36 | |||
+30 | 65 | 2.763 | 1.435 | 1.661 | 3522.56 | 2910.28 | 2839.17 | |||
+10 | 55 | 2.911 | 1.492 | 1.704 | 3205.84 | 2764.33 | 2780.10 | |||
-10 | 45 | 3.250 | 1.555 | 1.783 | 2935.27 | 2459.37 | 2638.61 | |||
-30 | 35 | 3.619 | 1.784 | 2.044 | 2789.42 | 2218.06 | 2529.50 | |||
-50 | 25 | 3.873 | 1.976 | 2.423 | 2642.17 | 2049.62 | 2485.73 |
Para meter | value | Total Cost | Profit | |||||||
+50 | 60 | 2.402 | 2.265 | 1.875 | 3891.57 | 3124.51 | 3054.36 | |||
+30 | 52 | 2.257 | 2.203 | 1.713 | 3522.56 | 2910.28 | 2839.17 | |||
+10 | 44 | 2.105 | 2.165 | 1.681 | 3205.84 | 2764.33 | 2780.10 | |||
-10 | 36 | 1.943 | 2.081 | 1.578 | 2935.27 | 2459.37 | 2638.61 | |||
-30 | 28 | 1.870 | 1.863 | 1.475 | 2789.42 | 2218.06 | 2529.50 | |||
-50 | 20 | 1.655 | 1.756 | 1.409 | 2642.17 | 2049.62 | 2485.73 | |||
+50 | 15 | 2.795 | 2.531 | 2.320 | 3891.57 | 3124.51 | 3054.36 | |||
+30 | 13 | 2.661 | 2.457 | 2.259 | 3522.56 | 2910.28 | 2839.17 | |||
+10 | 11 | 2.573 | 2.347 | 2.188 | 3205.84 | 2764.33 | 2780.10 | |||
-10 | 9 | 2.412 | 2.201 | 2.096 | 2935.27 | 2459.37 | 2638.61 | |||
-30 | 7 | 2.345 | 2.179 | 2.016 | 2789.42 | 2218.06 | 2529.50 | |||
-50 | 5 | 2.235 | 2.153 | 1.875 | 2642.17 | 2049.62 | 2485.73 | |||
+50 | 60 | 1.987 | 1.853 | 1.760 | 3891.57 | 3124.51 | 3054.36 | |||
+30 | 52 | 1.664 | 1.571 | 1.483 | 3522.56 | 2910.28 | 2839.17 | |||
+10 | 44 | 1.370 | 1.356 | 1.338 | 3205.84 | 2764.33 | 2780.10 | |||
-10 | 36 | 1.297 | 1.283 | 1.275 | 2935.27 | 2459.37 | 2638.61 | |||
-30 | 28 | 1.264 | 1.257 | 1.241 | 2789.42 | 2218.06 | 2529.50 | |||
-50 | 20 | 1.239 | 1.221 | 1.195 | 2642.17 | 2049.62 | 2485.73 | |||
+50 | 45 | 2.354 | 2.279 | 2.165 | 3567.10 | 3049.31 | 3098.21 | |||
+30 | 39 | 2.170 | 2.086 | 1.952 | 3417.05 | 2994.22 | 2947.18 | |||
+10 | 33 | 1.941 | 1.876 | 1.740 | 3307.53 | 2885.31 | 2856.37 | |||
-10 | 27 | 1.769 | 1.635 | 1.509 | 3268.37 | 2765.42 | 2664.00 | |||
-30 | 21 | 1.526 | 1.470 | 1.358 | 3191.30 | 2670.51 | 2509.11 | |||
-50 | 15 | 1.391 | 1.258 | 1.174 | 3034.67 | 2500.00 | 2481.03 | |||
+50 | 0.45 | 1.310 | 1.465 | 1.589 | 2473.11 | 1730.22 | 2017.27 | |||
+30 | 0.39 | 1.574 | 1.640 | 1.736 | 2705.43 | 1918.47 | 2384.53 | |||
+10 | 0.33 | 1.812 | 1.922 | 1.989 | 3058.24 | 2164.38 | 2673.40 | |||
-10 | 0.27 | 2.123 | 2.070 | 2.145 | 3347.80 | 2351.06 | 2945.82 | |||
-30 | 0.21 | 2.492 | 2.195 | 2.287 | 3692.47 | 2537.64 | 3255.70 | |||
-50 | 0.15 | 2.760 | 2.358 | 2.460 | 3903.12 | 2799.00 | 3509.35 | |||
+50 | 30 | 2.385 | 2.072 | 2.110 | 3392.46 | 2918.36 | 2840.79 | |||
+30 | 26 | 2.200 | 1.915 | 2.048 | 3175.13 | 2875.42 | 2711.54 | |||
+10 | 22 | 2.071 | 1.854 | 1.991 | 2917.00 | 2704.60 | 2657.18 | |||
-10 | 18 | 1.848 | 1.774 | 1.867 | 2739.26 | 2538.11 | 2302.63 | |||
-30 | 14 | 1.639 | 1.640 | 1.790 | 2543.35 | 2326.83 | 2199.29 | |||
-50 | 10 | 1.325 | 1.573 | 1.615 | 2319.67 | 2100.00 | 1978.63 | |||
+50 | 1.8 | 1.367 | 1.470 | 1.585 | 3141.47 | 2758.10 | 2890.05 | |||
+30 | 1.56 | 1.532 | 1.609 | 1.779 | 3250.26 | 2893.55 | 2918.62 | |||
+10 | 1.32 | 1.727 | 1.826 | 1.963 | 3319.51 | 2964.28 | 3022.37 | |||
-10 | 1.08 | 1.904 | 1.995 | 2.057 | 3471.43 | 3027.83 | 3126.29 | |||
-30 | 0.84 | 2.157 | 2.257 | 2.376 | 3520.79 | 3119.44 | 3257.81 | |||
-50 | 0.6 | 2.370 | 2.450 | 2.538 | 3752.00 | 3348.63 | 3486.90 | |||
+50 | 0.6 | 2.752 | 2.568 | 2.330 | 4180.57 | 3042.78 | 3506.79 | |||
+30 | 0.52 | 2.695 | 2.418 | 2.257 | 3912.36 | 2965.03 | 3481.20 | |||
+10 | 0.44 | 2.516 | 2.343 | 2.194 | 3764.25 | 2860.24 | 3358.18 | |||
-10 | 0.36 | 2.404 | 2.267 | 2.210 | 3580.19 | 2725.57 | 3293.49 | |||
-30 | 0.28 | 2.279 | 2.001 | 1.935 | 3318.38 | 2530.29 | 3167.16 | |||
-50 | 0.20 | 2.011 | 1.883 | 1.520 | 3127.93 | 2350.03 | 2948.57 |
Para meter | value | Total Cost | Profit | |||||||
+50 | 60 | 2.402 | 2.265 | 1.875 | 3891.57 | 3124.51 | 3054.36 | |||
+30 | 52 | 2.257 | 2.203 | 1.713 | 3522.56 | 2910.28 | 2839.17 | |||
+10 | 44 | 2.105 | 2.165 | 1.681 | 3205.84 | 2764.33 | 2780.10 | |||
-10 | 36 | 1.943 | 2.081 | 1.578 | 2935.27 | 2459.37 | 2638.61 | |||
-30 | 28 | 1.870 | 1.863 | 1.475 | 2789.42 | 2218.06 | 2529.50 | |||
-50 | 20 | 1.655 | 1.756 | 1.409 | 2642.17 | 2049.62 | 2485.73 | |||
+50 | 15 | 2.795 | 2.531 | 2.320 | 3891.57 | 3124.51 | 3054.36 | |||
+30 | 13 | 2.661 | 2.457 | 2.259 | 3522.56 | 2910.28 | 2839.17 | |||
+10 | 11 | 2.573 | 2.347 | 2.188 | 3205.84 | 2764.33 | 2780.10 | |||
-10 | 9 | 2.412 | 2.201 | 2.096 | 2935.27 | 2459.37 | 2638.61 | |||
-30 | 7 | 2.345 | 2.179 | 2.016 | 2789.42 | 2218.06 | 2529.50 | |||
-50 | 5 | 2.235 | 2.153 | 1.875 | 2642.17 | 2049.62 | 2485.73 | |||
+50 | 60 | 1.987 | 1.853 | 1.760 | 3891.57 | 3124.51 | 3054.36 | |||
+30 | 52 | 1.664 | 1.571 | 1.483 | 3522.56 | 2910.28 | 2839.17 | |||
+10 | 44 | 1.370 | 1.356 | 1.338 | 3205.84 | 2764.33 | 2780.10 | |||
-10 | 36 | 1.297 | 1.283 | 1.275 | 2935.27 | 2459.37 | 2638.61 | |||
-30 | 28 | 1.264 | 1.257 | 1.241 | 2789.42 | 2218.06 | 2529.50 | |||
-50 | 20 | 1.239 | 1.221 | 1.195 | 2642.17 | 2049.62 | 2485.73 | |||
+50 | 45 | 2.354 | 2.279 | 2.165 | 3567.10 | 3049.31 | 3098.21 | |||
+30 | 39 | 2.170 | 2.086 | 1.952 | 3417.05 | 2994.22 | 2947.18 | |||
+10 | 33 | 1.941 | 1.876 | 1.740 | 3307.53 | 2885.31 | 2856.37 | |||
-10 | 27 | 1.769 | 1.635 | 1.509 | 3268.37 | 2765.42 | 2664.00 | |||
-30 | 21 | 1.526 | 1.470 | 1.358 | 3191.30 | 2670.51 | 2509.11 | |||
-50 | 15 | 1.391 | 1.258 | 1.174 | 3034.67 | 2500.00 | 2481.03 | |||
+50 | 0.45 | 1.310 | 1.465 | 1.589 | 2473.11 | 1730.22 | 2017.27 | |||
+30 | 0.39 | 1.574 | 1.640 | 1.736 | 2705.43 | 1918.47 | 2384.53 | |||
+10 | 0.33 | 1.812 | 1.922 | 1.989 | 3058.24 | 2164.38 | 2673.40 | |||
-10 | 0.27 | 2.123 | 2.070 | 2.145 | 3347.80 | 2351.06 | 2945.82 | |||
-30 | 0.21 | 2.492 | 2.195 | 2.287 | 3692.47 | 2537.64 | 3255.70 | |||
-50 | 0.15 | 2.760 | 2.358 | 2.460 | 3903.12 | 2799.00 | 3509.35 | |||
+50 | 30 | 2.385 | 2.072 | 2.110 | 3392.46 | 2918.36 | 2840.79 | |||
+30 | 26 | 2.200 | 1.915 | 2.048 | 3175.13 | 2875.42 | 2711.54 | |||
+10 | 22 | 2.071 | 1.854 | 1.991 | 2917.00 | 2704.60 | 2657.18 | |||
-10 | 18 | 1.848 | 1.774 | 1.867 | 2739.26 | 2538.11 | 2302.63 | |||
-30 | 14 | 1.639 | 1.640 | 1.790 | 2543.35 | 2326.83 | 2199.29 | |||
-50 | 10 | 1.325 | 1.573 | 1.615 | 2319.67 | 2100.00 | 1978.63 | |||
+50 | 1.8 | 1.367 | 1.470 | 1.585 | 3141.47 | 2758.10 | 2890.05 | |||
+30 | 1.56 | 1.532 | 1.609 | 1.779 | 3250.26 | 2893.55 | 2918.62 | |||
+10 | 1.32 | 1.727 | 1.826 | 1.963 | 3319.51 | 2964.28 | 3022.37 | |||
-10 | 1.08 | 1.904 | 1.995 | 2.057 | 3471.43 | 3027.83 | 3126.29 | |||
-30 | 0.84 | 2.157 | 2.257 | 2.376 | 3520.79 | 3119.44 | 3257.81 | |||
-50 | 0.6 | 2.370 | 2.450 | 2.538 | 3752.00 | 3348.63 | 3486.90 | |||
+50 | 0.6 | 2.752 | 2.568 | 2.330 | 4180.57 | 3042.78 | 3506.79 | |||
+30 | 0.52 | 2.695 | 2.418 | 2.257 | 3912.36 | 2965.03 | 3481.20 | |||
+10 | 0.44 | 2.516 | 2.343 | 2.194 | 3764.25 | 2860.24 | 3358.18 | |||
-10 | 0.36 | 2.404 | 2.267 | 2.210 | 3580.19 | 2725.57 | 3293.49 | |||
-30 | 0.28 | 2.279 | 2.001 | 1.935 | 3318.38 | 2530.29 | 3167.16 | |||
-50 | 0.20 | 2.011 | 1.883 | 1.520 | 3127.93 | 2350.03 | 2948.57 |
[1] |
Magfura Pervin, Sankar Kumar Roy, Gerhard Wilhelm Weber. Multi-item deteriorating two-echelon inventory model with price- and stock-dependent demand: A trade-credit policy. Journal of Industrial and Management Optimization, 2019, 15 (3) : 1345-1373. doi: 10.3934/jimo.2018098 |
[2] |
Magfura Pervin, Sankar Kumar Roy, Gerhard Wilhelm Weber. An integrated inventory model with variable holding cost under two levels of trade-credit policy. Numerical Algebra, Control and Optimization, 2018, 8 (2) : 169-191. doi: 10.3934/naco.2018010 |
[3] |
Shuhua Zhang, Longzhou Cao, Zuliang Lu. An EOQ inventory model for deteriorating items with controllable deterioration rate under stock-dependent demand rate and non-linear holding cost. Journal of Industrial and Management Optimization, 2021 doi: 10.3934/jimo.2021156 |
[4] |
Magfura Pervin, Sankar Kumar Roy, Gerhard Wilhelm Weber. A two-echelon inventory model with stock-dependent demand and variable holding cost for deteriorating items. Numerical Algebra, Control and Optimization, 2017, 7 (1) : 21-50. doi: 10.3934/naco.2017002 |
[5] |
Sankar Kumar Roy, Magfura Pervin, Gerhard Wilhelm Weber. A two-warehouse probabilistic model with price discount on backorders under two levels of trade-credit policy. Journal of Industrial and Management Optimization, 2020, 16 (2) : 553-578. doi: 10.3934/jimo.2018167 |
[6] |
Prasenjit Pramanik, Sarama Malik Das, Manas Kumar Maiti. Note on : Supply chain inventory model for deteriorating items with maximum lifetime and partial trade credit to credit risk customers. Journal of Industrial and Management Optimization, 2019, 15 (3) : 1289-1315. doi: 10.3934/jimo.2018096 |
[7] |
Guiyang Zhu. Optimal pricing and ordering policy for defective items under temporary price reduction with inspection errors and price sensitive demand. Journal of Industrial and Management Optimization, 2022, 18 (3) : 2129-2161. doi: 10.3934/jimo.2021060 |
[8] |
Puspita Mahata, Gour Chandra Mahata. Two-echelon trade credit with default risk in an EOQ model for deteriorating items under dynamic demand. Journal of Industrial and Management Optimization, 2021, 17 (6) : 3659-3684. doi: 10.3934/jimo.2020138 |
[9] |
Tien-Yu Lin, Ming-Te Chen, Kuo-Lung Hou. An inventory model for items with imperfect quality and quantity discounts under adjusted screening rate and earned interest. Journal of Industrial and Management Optimization, 2016, 12 (4) : 1333-1347. doi: 10.3934/jimo.2016.12.1333 |
[10] |
Biswajit Sarkar, Bijoy Kumar Shaw, Taebok Kim, Mitali Sarkar, Dongmin Shin. An integrated inventory model with variable transportation cost, two-stage inspection, and defective items. Journal of Industrial and Management Optimization, 2017, 13 (4) : 1975-1990. doi: 10.3934/jimo.2017027 |
[11] |
Jui-Jung Liao, Wei-Chun Lee, Kuo-Nan Huang, Yung-Fu Huang. Optimal ordering policy for a two-warehouse inventory model use of two-level trade credit. Journal of Industrial and Management Optimization, 2017, 13 (4) : 1661-1683. doi: 10.3934/jimo.2017012 |
[12] |
Kun-Jen Chung, Pin-Shou Ting. The inventory model under supplier's partial trade credit policy in a supply chain system. Journal of Industrial and Management Optimization, 2015, 11 (4) : 1175-1183. doi: 10.3934/jimo.2015.11.1175 |
[13] |
Chandan Mahato, Gour Chandra Mahata. Optimal replenishment, pricing and preservation technology investment policies for non-instantaneous deteriorating items under two-level trade credit policy. Journal of Industrial and Management Optimization, 2021 doi: 10.3934/jimo.2021123 |
[14] |
Mohsen Lashgari, Ata Allah Taleizadeh, Shib Sankar Sana. An inventory control problem for deteriorating items with back-ordering and financial considerations under two levels of trade credit linked to order quantity. Journal of Industrial and Management Optimization, 2016, 12 (3) : 1091-1119. doi: 10.3934/jimo.2016.12.1091 |
[15] |
Biswajit Sarkar, Bimal Kumar Sett, Sumon Sarkar. Optimal production run time and inspection errors in an imperfect production system with warranty. Journal of Industrial and Management Optimization, 2018, 14 (1) : 267-282. doi: 10.3934/jimo.2017046 |
[16] |
Javad Taheri-Tolgari, Mohammad Mohammadi, Bahman Naderi, Alireza Arshadi-Khamseh, Abolfazl Mirzazadeh. An inventory model with imperfect item, inspection errors, preventive maintenance and partial backlogging in uncertainty environment. Journal of Industrial and Management Optimization, 2019, 15 (3) : 1317-1344. doi: 10.3934/jimo.2018097 |
[17] |
Jan Sokołowski, Jan Stebel. Shape optimization for non-Newtonian fluids in time-dependent domains. Evolution Equations and Control Theory, 2014, 3 (2) : 331-348. doi: 10.3934/eect.2014.3.331 |
[18] |
Pin-Shou Ting. The EPQ model with deteriorating items under two levels of trade credit in a supply chain system. Journal of Industrial and Management Optimization, 2015, 11 (2) : 479-492. doi: 10.3934/jimo.2015.11.479 |
[19] |
Sudip Adak, G. S. Mahapatra. Effect of reliability on varying demand and holding cost on inventory system incorporating probabilistic deterioration. Journal of Industrial and Management Optimization, 2022, 18 (1) : 173-193. doi: 10.3934/jimo.2020148 |
[20] |
Daniel Guo, John Drake. A global semi-Lagrangian spectral model of shallow water equations with time-dependent variable resolution. Conference Publications, 2005, 2005 (Special) : 355-364. doi: 10.3934/proc.2005.2005.355 |
Impact Factor:
Tools
Metrics
Other articles
by authors
[Back to Top]